My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC23730
DRMS
>
Back File Migration
>
Inspection
>
INSPEC23730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:33 PM
Creation date
11/18/2007 9:51:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Inspection
Doc Name
UNDERGROUND COAL MINE INSPECTION REPORT
Inspection Date
1/14/1981
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. •; - <br /> <br />Page 2 <br />Disoosal of Excess Rock <br />Comments <br />Protection of Hydrologic Svstem <br />Water leaving affected area <br />Surface water monitoring <br />Diversions temporary/permanent <br />Scream channel diversions <br />Sediment control/maintenance of ponds <br />Discharge structures <br />Acid or Toxic materials <br />Ground water monitoring <br />Water rights <br />Alluvial Valley floor <br />Permanent impounds <br />Haul E access road drainage <br />Grade <br />Drainage Ditches <br />Culverts erosion control <br />Road surface material <br />yaintenance <br />Other transport facilities <br />Comments <br />I. A portion of the east "undisturbed drainage" ditch needs to be cleaned on <br />the north end about 75 yards before it dumps into the natural drainage. <br />2. The piezometer on the north side of the refuse pile needs additional fill <br />placed around the pipe. <br />3. In the process of clearing the area for refuse disposal the diversion <br />ditch was buried. Drainage must be installed as described in the approved <br />mine plan. <br />4. The west diversion ditch running into the sediment pond has not~been <br />widened and rip-rapped or stabilized by excelsior. <br />5. The east diversion ditch running into the pond north of the culvert has <br />still not been deepened or cleaned of organic material. <br />6. A culvert is going to be installed where the drainage ditch crosses by <br />the trash dump area. This should alleviate blockage problems there. <br />7. The ditch below the diesel tank needs to be cleaned where water from the <br />ditch above drops into it. <br />8. The road has still not been taken out where it crossed the diversion ditch <br />near the office trailer. <br />Dams Constructed of or Imoounding Water Materials <br />Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.