My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC23651
DRMS
>
Back File Migration
>
Inspection
>
INSPEC23651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:30 PM
Creation date
11/18/2007 9:51:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
9/19/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br />27 September 2007 <br />Pg 6/7 <br />Topsoil (cont.) -The operator, through the contractor the Bower Brothers, has been <br />removing topsoil in the Taylor Creek drainage in what appears to be the area of the <br />East Taylor Fill. The topsoil is being stockpiled in the pile above the East Pit highwall. <br />This is at least the third consecutive year that Bower has removed topsoil at the <br />Colowyo Mine. As in the past, Bower is pushing the topsoil into windrows with a D10 <br />dozer and loading 8-10 CAT 773 haul trucks with one or two CAT 385 excavators. The <br />operation was progressing nicely. Colowyo has not requested that any additional <br />areas be considered for exemption from topsoil salvage besides the two that have <br />been discussed in prior inspection reports. <br />-The operator has finished spreading the piles of topsoil that were hauled to the East <br />pit that were to be spread last year. Additionally, Colowyo is using a topsoil stockpile <br />that is in the middle of the East Pit reclamation. Colowyo has, to date, completed <br />almost 80 acres of topsoil replacement in the East Pit. Colowyo has hired a <br />contractor to seed the areas of the East Pit where topsoil has been replaced in <br />October. Currently, based on the changes made to the permit through Technical <br />Revision 62, approved on 29 May 2006, Colowyo is replacing approximately eight <br />inches of topsoil (as opposed to the previously approved cover of 18 inches). <br />General Mine Plan Compliance: -The 101 dragline is on the East Pit highwall <br />performing reclamation. <br />-The 102 dragline was working on removing E-Seam overburden in the West Pit. The <br />current plan is for the 102 to perform reclamation in the West Pit as it is cycled out of <br />the pit and would normally be sitting idle. This is a great plan that will get the <br />reclamation in the West Pit completed faster than anticipated. <br />-The 103 dragline was also removing overburden on the E-Seam. <br />-The 1 14 shovel operation was currently working on removing the X-Seam <br />overburden. <br />-The operator was removing and hauling X-Seam coal at the time of the inspection. <br />-The operator was drilling and loading explosives in the B-Seam overburden for a <br />shot. <br />-The operator was dumping overburden in the final pit area of the East Pit in an effort <br />to finish the East Pit reclamation. <br />-The operator has a contractor (Krule) working in the West Taylor drainage, around <br />the location of the West Taylor fill. Krule is removing and burning the trees in advance <br />of the topsoil stripping operations. They are using a CAT D6 dozer to knock over the <br />trees and they are loading them into incinerators with a CAT 321 excavator with a <br />claw attachment and a logging skidster. The incinerators are the size of a dumpster <br />and they force air onto the burning trees, providing oxygen for q complete burn. <br />There is very little smoke once the process begins. Prior to lighting the incinerators, the <br />contractor is removing the topsoil and digging a narrow trench for the ashes. <br />Currently Krule has four incinerators on site and is on schedule. There were no <br />problems noted with the Krule operation at the time of the inspection. <br />