Laserfiche WebLink
<br /> <br />MINE SITE EVALUATION INSPECTION REPORT PAGE 3 <br />O~~o Creek ~2 <br />B. Performance standards that assure reclamation quality and <br />timeliness: <br />1 - 1. <br />1 2. <br />1 3. <br />1 4. <br />5 5. <br />5 6. <br />Topsoil handling <br />Backfilling & grading <br />Timing of reclamation <br />Success of revegetation <br />Disposal of excess spoil <br />Handling of acid or <br />toxic materials <br />1 _ 7. <br />1 8. <br />1 9. <br />1 10. <br />Timing of <br />revegetation <br />Highwall <br />elimination <br />Downslooe <br />spoil disposal <br />Post mining <br />land use <br />C. For each standard marked (2), what action(s) has the State <br />taken to cause the violation to be corrected? <br />D. For each standard marked (3), indicate what action(s) the <br />State should have taken. <br />E. For each standard marked (4), exolain why it is unkno•.on <br />whether or not t17e State has failed to taY.e appropriate <br />action. <br />Ten-Day Notice No. 83-2-0-1 was issued for failure to control diversion <br />disr_harge to reduce erosion, and failure to maintain authorizations to <br />operate at or near the mine. The Notice was issued on May 31, 1983, and <br />the State's response to the notice is forthcoming and not yet received. <br />Water monitoring analyses were among the records unavailable for review <br />at the mine during the inspection. <br />i <br />