My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC23368
DRMS
>
Back File Migration
>
Inspection
>
INSPEC23368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:16 PM
Creation date
11/18/2007 9:49:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978311
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Gold Eagle Mining Inc.
Inspection Date
10/4/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date: 04-Nov-2002 <br />User: WHE <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no.: M-1978-311 Site : Hawkeye Mine <br />Abbreviation : none State :Colorado <br />F'I M311 000 C t ~ S Mi uel <br />I ename . - oun y . an g <br />Agency or organization name : DMG <br />Permit or job action :General 110(2) bond review <br />TASK LIST (DIRECT COSTS( FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Close portal with backfill minesea/ 1 4.0 $721 <br /> <br />002 -Revegetate 1 acre gffected area revege 1 4.0 $890 <br /> <br />003 -Haul reclamation equipment to and from job site mobilize 3 6.0 $1, 570 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 14.00 $3,191 <br />'includes inflation factor adjustment of: NA % TOTAL DIRECT COST'=I $3,181 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability InSUranCe : 1.55 % of direct total = $49 <br />Performance bond : 1.05 % of direct total = $33 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $318 <br />' not required (oregp. operator serves as super.) <br />PROJECT MANAGEMENT- <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTINGENCY- <br />confingencies accounted ror at task level <br />TOTAL O 8 P = $401 <br />CONTRACT AMOUNT (direct + O 8 P) _ $3, 582 <br /> <br />NA NA NA total = NA <br />5.00 % of cntr. NA total = $179 <br />NA' NA total = NA <br />TOTAL INDIRECT COST= $580 <br />TOTAL BOND AMOUNT (direct+ indirect) _ $3,761 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.