Laserfiche WebLink
<br />[leloss are comments on the inspection. 1'he comments include discussicm of observations made During the inspection. Comments <br />also descrilx arty enforcement actions taken During the inspection and the facts or eeidence supporting the enforcement action. <br />Jem Nculeton uf'1 wentymile Coal ('ompany (I\ventymilcl accompanied Byron \\'alker I1Valker) of the <br />('alurada Division ofhlinertls and Geology (Division) during this inspection. the priman purpose sea. to <br />inspect accomplishment utrelx,rted rcmrdial actions with regard to notice of violatian C'V-'tlpi-q0>. Part I. <br />I luwever, this inspection was nut limited to th<u purpose. Photographs included in this report arc on file in <br />digitised ti,mt at the L)i~ ision. and will fk provided to Twcntymilc upon rcyuest. <br />111'DROLO(iIC 8:11.:\1\Ch. <br />:\ manually ulxmted ball valve had been imtalled on a standpipe at the \1\' Mains Ventilation Shun Iscc <br />Picture I1. <br />\ r+nnainntent basin had been constructed lsstwden ti•anu with plastic sheeting) to bald Qte fuel storage <br />barrels anJ lubricating m:uerials at the 18-Right Ventilation Shali work site (sec Picturr _'). <br />SUPPORT PACILt11ES <br />1'he culvert an the access road at the entrance into the N11' Vcnt Shul9 pad area had b(xn cleaned. <br />l he turn-section of the diverter on the N\V 1lains Ventilation Shaft had been installed (see Picture 3). <br />the 18-Right Ventilation Shaft liner had Ixcn set and grouted into place. and acover-plate placed over the <br />shall jsec Picture ~). <br />topsoil had hccn laid hack from the west collection ditch at the I K-Right Ventilation Shst1 alternative <br />sediment control device and the area ti,rnted and shaped (see Picture 1). <br />I og?-(IS(+ CF' Inspection of lone I J, _'(N15. ('age : tit (. pogeti. Rt ~N <br />I'ieture I Picture' <br />