My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC23260
DRMS
>
Back File Migration
>
Inspection
>
INSPEC23260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:12 PM
Creation date
11/18/2007 9:48:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980146
IBM Index Class Name
Inspection
Doc Date
6/27/2001
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • III IIIIIIIIIIIIIIII <br /> <br /> CIRCES Cost Esttmattna Software <br /> <br /> COST SUMMARY FORM <br /> <br />E < ~,~ <br />.a -~ ~ . <br />lF <br />;" ~~V6' - <br />~~ <br /> ~ <br />PROJECT IDENTIFICATION <br />Date : 20.Jun-2001 Permd or job no M 1980-146 SIQ , <br />UN <br />~~ntoya Pit 1Qn~ <br />User . SSS Abbreviation : none State : CoP~ <br />~r <br /> Filename : M146-000 County : La P/ata <br />~/'Bpi,;.,, <br />Agency or organization name : DMG i <br />Permit or job action : TR-002 Reclamation Estimate for AM-03 and BLM South Lot Phase 1 areas <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />016 -Reduce highwall above lower pit in SW corner of site by backbiting dozer 1 27.8 $4,968 <br />026 -Cut and fill reduction of BLM South Lot Phase 1 highwall dozer 1 16.39 $2, 952 <br />036 -Smooth grade pit floor of 10 acre AM-03 and 20 acre Phase 1 area dozer 1 41.4 $7,465 <br /> <br /> <br />O66 -Loader carry topsoil from stockpiles to AM-03 and Phase 1 pit /Ioor area loader 1 210.2 $18, 821 <br />07b -Replace 1 foot of topsoil over AM-03 and Phase 1 pit slopes dozer 1 12.7 $2,273 <br />08b -Spread 1 foot oftopsoil over AM-03 and Phase 1 pit foor area dozer 1 27.11 $4, 831 <br />096 -Revegetate AM-03 and Phase 1 aflected areas revege 2 80.0 $43, 551 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />sueTOTALS: 415.8 $84,861 <br />'includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />'not n'quiretl (or eqp. operator serves as super.) <br />1.55 <br />1.05 <br />NA' <br />DRECT COST= <br />TOTAL $84,861 <br />~~ttpp <br />.S <br /> <br />%o(direct total= $1,315 <br />of direct total = $891 <br />NA NA total = NA <br />10.00 %ofdirect total= $8,486 <br />TOTAL 08 P= $10,692 <br />CONTRACT PMOUNT (direct t O 8 P) _ $95, 553 <br />PROJECT MANAGEMENT - <br />Engineering work and/or contracUbid preparation : NA NA NA fatal = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $4, 778 <br />coNrINCENCV- NA' NA total = NA <br />'contingencies accaunfed /oral task level TOTAL INDIRECT COST= 51$,470 <br />TOTAL BOND AMOUNT (direct+ indirect) _ $f 00,331 <br />(_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.