Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-1979-166 <br />;, INSPECTION DATE 12-8-2004 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMSIPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1 ~ Th . enclosed reclamation hood re .al . ilatinn indicates this mining operation is rurrentty under- <br />bonded. <br />CORRECTIVE ACTION: <br />Adequate financial warranty must be submitted to DMG within 60 davs of the mailine date of this <br />2~ NOnP. <br />CORRECTIVE ACTION: <br />3. None <br />CORRECTIVE ACTION: <br />CORRECTION <br />DATE <br />02 / 28 / 2005 <br />PB or PV: PB <br />TOPIC(S): FN <br />/ / <br />PB or PV: <br />TOPIC(S): <br />/ / <br />PB or PV: <br />TOPIC(S): <br />I, Steve Shuey, hereby certify that on December 30, 2004, I deposited a true and complete copy of this foregoing inspection <br />report in the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, and to <br />those others within the body of this report who have been designated to receive copies (DMG personnel excepted). <br />-3D ~~( <br />Signet e <br />