My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC23194
DRMS
>
Back File Migration
>
Inspection
>
INSPEC23194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:09 PM
Creation date
11/18/2007 9:48:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Inspection
Doc Date
9/5/2002
Doc Name
Inspection Report
From
DMG
To
ITEC Environmental Colorado Inc.
Inspection Date
8/14/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Sl., Room 215 <br />Denver, Colorado 80203 <br />('hone: 130)1 866-3567 <br />FAX:(}03)AJ2-8106 <br />April 26, 1997 <br />Mr. Curtis Bernhardt <br />Colino Oro Molino, Inc. <br />76 Beaver Street, Suite 500 <br />New York, NY 10005 <br />111 IIIIIIIII1111111 E OF COLORADO <br />999 <br />~"~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lochhead <br />Executive Director <br />Michael B. LOng <br />Division Direcor <br />RE: Ground Water Monitoring, Gold Hill Mill, Permit No. M-94-117 <br />Dear Mr. Bernhardt: <br />The terms and conditions of the Gold Hill Mill reclamation permit <br />require that the four (4) ground water monitoring wells located down <br />gradient from the mill tailing pond be sampled and analyzed once per <br />calendar quarter, and that the results of the ground water analysis be <br />provided to the Division. The last set of ground water analyses that <br />have been received by the Division are from a sampling event that <br />occurred on March 16, 1996. Please provide the data from the second, <br />third, and fourth quarters of 1996, and the first quarter of 1997, no <br />later than May 15, 1997. Please also assure that the caps on the <br />monitoring wells remain locked at all times; this will be a topic for <br />the Division's next inspection of the Gold Hill Mill. <br />In reviewing the ground water monitoring data for the Gold Hill Mill <br />from past sampling events, the Division has found that the data is <br />inconsistent in terms of parameters analyzed and laboratory detection <br />limits employed. For the second quarter of 1997 sampling event, and <br />for all future sampling events, the Division will require that the <br />following table of parameters and detection limits be employed: <br />DETECTION LIMIT, ucr/L <br />Aluminum 50 <br />Arsenic 1 <br />Cadmium 0.25 <br />Chromium(VI) 10 <br />Copper 5 <br />Iron l0 <br />Lead 5 <br />Manganese 4 <br />Mercury 0..2 <br />Selenium 1, <br />Silver 0.2 <br />Uranium 10 <br />Zinc 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.