My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC23136
DRMS
>
Back File Migration
>
Inspection
>
INSPEC23136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:06 PM
Creation date
11/18/2007 9:48:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
2/3/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Marr Strip Mine and Walden loadout facility conducted on <br />February 3, 2005 by Mike Boulay of the DMG. There were no representatives from Kerr Coal <br />Company present during the inspection at the mine site or loadout facility. The mine site was <br />heavily snow covered at the time of the inspection, and weather conditions were foggy and cold. <br />Availability of Records <br />Records were reviewed at the Montgomery Watson Hazza office in Steamboat Springs on the <br />afternoon of February 2, 2005. Please see the attached Availability of Records checklist. The <br />files have not been updated with the third and fourth quarter quarterly pond inspections and the <br />current Certificate of Liability Insurance was not available for review in the records file. Please <br />continue to maintain and update all records on a regular basis. <br />The permanent light use road accessing the site was icy and snow packed. Access was very <br />limited due to the snow packed conditions and drifting snow entirely covering the surface of the <br />road. Perimeter azeas at the site were well maintained and no problems were noted. <br />Hydrologic Balance <br />Site sedimentation ponds E, F, and G were viewed. Pond E was retaining water at a level well <br />below the primary spillway. The surface of Pond E was frozen. Pond F appeared to be retaining <br />a small amount of water and Pond G was not retaining water. Pond surfaces, inlets and <br />embanlffnents were snow covered at all of these pond locations, and none of the ponds were <br />dischazging at the time of the inspection. <br />Loadout <br />The entrance road to the loadout and entire loadout azea were snow covered. The loadout pond <br />was retaining water and was frozen at the surface and entirely snow covered. The loadout pond <br />was not discharging water. The entrance gate was closed and there was no activity at the site. <br />No problems were noted at the loadout facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.