My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC23055
DRMS
>
Back File Migration
>
Inspection
>
INSPEC23055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:03 PM
Creation date
11/18/2007 9:47:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990059
IBM Index Class Name
Inspection
Doc Date
7/30/1999
Doc Name
GENERAL 110 1 BIND REVIEW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATING FORM - REVEGETATI ON 40RK cont~d Filename : M059-4 <br />___________________________________ <br />B. SHRUB 8 TREE TRANSPLANTS <br />____________________________ ~ ~ MATERIAL: PLANTING: <br />SPECIES NAME ~ OUAN./ACRE ~ STOCK TYPE 8 SIZE I E/PLANT I E/PLANT <br />No transplants requi red <br />C. SEEDBED PREPARATION <br />_______________________ <br />_______________________ <br />Tilling method #1: hand raking +* <br />#2: <br />D. SEED APPLICATION <br />---- <br />Seeding method: broadcast seeding (~93 contr. data) <br />___________________________________ <br />E. FERTILIZING <br />8701.12 <br />Total cost/acre: 5701.12 <br />------------ <br />Total cost/acre: 5155.76 <br />_________= FERTILIZER / SOIL AMENDMENT ~ UNITS/ACRE ~ UNIT ~ S/UNIT E/ACRE <br />Na[eri als used #1: 10-34-0, 18-46-0, 5-10-5 • ~ 200.00 ~ pound ~ 50.21 ~ 541.60 <br />#2: <br />#3: I ~ ~ ~ <br />Application method #1: hand held broadcast spreader <br />#2: <br />F. MULCHING <br />sheet 2 of 2 <br />E/PERT. ~ TOTAL ~ TOTAL <br />PELLET I E/PLANT ~ S/ACRE <br />___=====I=========I_____________ <br />50.00 <br />Total transplant cost/acre: 50.00 <br />Total materials cost/acre: 541.60 <br /> 5105.54 <br />Total application cost/acre: 5105.54 <br />MULCH / NETTING / OTHER MATERIALS I UNITS/ACRE ~ UNIT ~ S/UNIT I E/ACRE <br />Materials used #1: hay (delivered) - bale * ~ 2.00 ~ bale ~ 55.54 ~ 511.07 <br />#2: <br />#3: <br />#4: <br />Application method #1: hand spread (hay spr. 1" deep) ++ <br />#2: <br />#3: <br />Total materials cost/acre: 511.07 <br />51,658.56 <br />Total application cost/acre: <br />G. JOB COST <br />Total area to be seeded: 0.15 acres. Total E/acre 52,766.11 Total Initial Job Cost= <br />________________ _________ <br />Estimated failure rate: 20.00% of area. Total 5/acre• E2, 766.11 Total Reseeding Costs = <br />_____________ ________________ <br />` Reseeding cast items: A C D E F GRAND TOTAL JOB LOST = <br />51,658.56 <br />5414.92 <br />582.98 <br />5497.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.