Laserfiche WebLink
III III IIIIIIIIII III <br />(Pane 3) <br />MINE ID # OR PROSPECTING ID # <br />INSPECTION DATE 01/08/01 _ <br /> <br />- _ - -INSPECTOR'S-INITIALS SC <br />~~ The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were idenCified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. RECEIVED <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />MAR 012001 <br />DlYision of Minerals and Geology <br />DATE <br />p,% <br />~'~ <br />t~ <br />,' <br />~LL <br />1. Rule 3.1.9(3) requires the operator to store topsoil stockpiles <br />in areas where disturbance by ongoing mining will be minimized. <br />The operator will need to relocate the topsoil pile that is <br />currently in advance of the pit area. Documentation in the form <br />of photographs demonstrating compliance is due by March 9, 2001. <br />PB or PV;PB <br />TOPIC (S):TS <br />March 9, 2001 <br />I 1CT VJ2 0~ <br />~a ve ~ ~'o~ soy' <br />So we c~~ <br />~:; <br />:., <br />.,, <br />;, <br />~, <br />.,, <br />~~ <br />!Y <br />i ~ <br />W1 ~ ~~ C~-rte/el <br />~YOv~ <br />w , C l~ CO ~,"T' y <br />(~ ll I i <br />1 ~ O ~ C~ ~ ~r , C~~ e <br />I <br />