Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
12/9/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 2) • <br />~ MINE ID # OR PROSPECTING ID # M-78-052 <br />INSPECTION DATE_December 9, 1997 INSPECTOR'S INITIALS TAS <br />OBSERVATIONS <br />1. A site inspection was conducted of the Howe Pit located two (2) miles southwest of the <br />town of Henderson. Present during the inspection were Tim Buterbaugh and Tom Turnipseed. <br />There were snow flurries during the inspection and the access roads driven on were very <br />muddy. <br />2. The Howe Pit is permitted for a total of 389.24 acres with a financial warranty of <br />$328,800 in the form of Corporate Surety. The designated post-mining land uses are <br />Recreation, wildlife Habitat, and Developed Water Resources. <br />,.. 90 ov~aO <br />3. The site is currently disturbed with approximatley h6-2- acres affected by mining. The <br />operator has designed a phased mining plan and is currently excavating material in the Phase <br />5 Area. The mining plan specifies 11 phases of disturbance. Therefore, approximately SOe <br />of the mineable deposit has been removed. All disturbance was found to be well within the <br />permit boundary. There was also a site entrance sign posted, as required by Rule 3.1.12. <br />4. Available topsoil has been and is being salvaged according to the mining plan. <br />Approximately 5 acres have already been regraded to final reclamation contours and topsoiled. <br />5. There are large stockpiles of overburden and topsoil east of the current working area <br />which will need to be regraded in order to achieve the desirable post-mining contours. Mr. <br />Buterbaugh estimated the overburden and topsoil stockpiles to contain approximately 300,000 <br />cubic yards of material. <br />6. All aspects of the water management system including channels, sumps, and hydraulic <br />structures were inspected and found to be operating according to the terms of the mining <br />plan. Ground water, runoff water, and process water discharged from the site appeared to be <br />clear and free of sediment. The operator has an NPDES water discharge permit for the Howe <br />Pit, issued by the Colorado Department of Health. <br />7. The reclamation plan specifies the creation of two (2) large lined reservoirs with semi- <br />irregular shore lines. The reservoirs will be fully lined with shales, clays, and overburden <br />creating an impervious barrier for water storage. The operator has provided an alternate <br />reclamation plan for the creation of wildlife/recreation use in the event that adequate water <br />rights for water storage and evaporative loss cannot be obtained within the required <br />timeframe. Mr. Buterbaugh indicated that the operator presently has adequate water rights <br />for the Howe Pit, although there is no correspondance in the permit file to verify this <br />statement. The Division requests that the operator clarify this issue by providing an update <br />on the status of the water rights needed during the mining and reclamation phases of the <br />operation and of the water rights currently held by the operator. This information is <br />necessary as it will determine whether the reclamation cost as mentioned in item 8 below will <br />be calculated for the primary or the alternative reclamation plan. <br />8. Although there is no specified limit on the number of acres that may be disturbed at any <br />one time, the operator has provided a reclamation bond adequate for reclamation of 56.46 <br />acres (Stages o, 1, and 25 disturbed acres) and construction of all planned hydraulic <br />structures. It appears that all planned hydraulic structures have been completed, therefore <br />the total number of disturbed acres which can be reclaimed according to the existing <br />reclamation plan is unknown. The reclamation cost was last calculated by the Division in <br />1990. As a result, the Division will calculate a current reclamation cost for the Howe Pit, <br /> <br />