My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC22731
DRMS
>
Back File Migration
>
Inspection
>
INSPEC22731
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:22:48 PM
Creation date
11/18/2007 9:45:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Inspection
Doc Date
10/26/2005
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
10/11/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ TRAPPER MINING INC. Permit C-010-81 Field Visit 10/12/2005 ContinnatiOn Page <br />Person ~ Number Date <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified Elsewhere, 6=Previously Cited <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1._ Drainage Control <br />2._ Inspections & Certifications <br />3._ Siltation Structures <br />4._ Discharge Structures <br />5._ Diversions <br />6._ Effluent Limits <br />7._ Ground Water Monitoring <br />8._ Surface Water Monitoring <br />9._ Drainage -- Acid-Toxic Materials <br />10._ Impoundments <br />11._ Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. 1 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />D. Backfilling & Grading H. <br />Subsidence Control Plan <br />1 ._ Exposed Openings _ <br />I. Roads <br />2 ._ Contemporaneous Reclamation 1. <br />Road Construction <br />3 ._ Approximate Original Contour _ <br />2. Certification <br />4 ._ Highwall Elimination 3 -Drainage <br />5 ._ Sleep Slopes (includes downslope) 4._ Surfacing and Maintenance <br />6 ._ Handling of Acid & Toxic Materials 5. <br />Reclamation <br />7 ._ Stabilization (rills and gullies) ^ <br />J, Signs & Markers <br />E. Excess Spoil Disposal l.i Signs <br />1 ._ Placement 2. <br />Markers <br />2 ._ Drainage Control _ <br />K. <br />Distance Prohibitions <br />3. _ Surface Stabilization _ <br />L. Revegetation <br />4. _ Inspections & Certifications <br />1._ Vegetative Cover <br />F. C oal Mine Waste 2. Timing <br /> (Refuse Piles/Impoundments) M. <br />Postmining Land Use <br />1. _ Drainage Control ~ <br />2. Surface Stabilization N. Other <br />3. Placement General <br />4. Inspections and Certifications Performan ce <br />5. _ Impounding Structures CatagOry <br />G. U se Of Explosives ~ 1 1) topsoil evaluation <br />1. Blaster Certification <br />2. _ Distance Prohibitions 2) <br />3. _ Blast Survey/Schedule _ <br />4. _ Warnings & Records 3) <br />5. _ Control of Adverse Effects _ <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br />A. Administrative ....................................................... .................. <br />L Valid Permit ..............._................... _....._............................... ........773.11 <br />2. Mining within Bonded Area ......................................... .......773.11 <br />3 . Terms & Conditions of Permit ...................................... .......773.17 <br />4. Liability Insurance ......................................................... .......800.60 <br />5. Ownership and Contro] .................................................. ......778.13 <br />6. Temporary Cessation ..............................842.11(e) & 8 16/817.131 <br />7. AML Rec. Fees -- Non-Respondenc._......_ .................. ..870.15(b) <br />8. AML Rec. Fees -- Failure to Pay ................................... ..870.15(x) <br />E. Excess Spoil Disposal ...........................................(816/817.71.74) <br />1. Placement ...........................................................................................71(e) <br />2. Drainage ControL ..............................._..............................................71(f) <br />3. Surface Stabilization_ ........................................................................Jl(g) <br />4. Inspections &Certifications ...............................................................71(h) <br />F. Coal Mine Waste (ReFuse PilesHmpoundments) ,,,,,($16/817.81-84) ~ <br />1. Drainage Control ................................................ ...............................83(a) <br />2. Surface Stabilization ........................_._....._....... ...............................83(b) <br />3. Placement ............................................................ ...............................83(c) <br />4. Inspections and Certifications .............................. .............................83(d) <br />5. Impounding Strucmres ........................................ ...................................84 <br />B. Hydrologic Balance ......................................(816/817.41-57) G. Use of Explosives..................................................(816/817.61-68) <br />I. Drainage Con[rol ............................................ .............................45 <br />2. Inspections &Certifications ........................... ..................49(a)(10) <br />3. Siltation Stmctures ......................................... .............................46 <br />4. Discharge Structures ..................................... ..............................47 <br />5. Diversions ..........:........................................... .............................43 <br />6. Effluent Limits ............................................... .............................42 <br />7. Ground Water Monitoring .............................. ..................._...41(c) <br />8. Surface Water Monitoring ....................._....... ._.._.................41(e) <br />9. Drainage--Acid-Toxic Materiels ................... ................._.....41(t) <br />10. Impoundments ................................................ ............................49 <br />11. Stream Buffer Zones ...................................... .............................67 <br />C. Topsoil &Subsoil ...............................................(816/817.22) <br />1. Removal .................................................... ..............................22(a) <br />2. Substitute Materials .................................. ...............................22(c) <br />3. Storage and Protection .............................. ...............................22(c) <br />4. Redistribution ............................................ ..............................22(d) <br />D. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />I. Blaster Certification ................................. ..........................................61(c) <br />2. Distance Prohibitions ............................._ ..........................................61(d) <br />3. Blast Survey/Schedule ............................. ..........................................62-64 <br />4. Warnings & Records ............................... .......................................6G & 68 <br />~. Control of Adverse Effects ...................... ...............................................67 <br />H. Subsidence Control Plan ................. ........................(817.121-122) <br />I. Roads ................................................ .................(816/817.150-151) <br />1. Road Construction ................................... ........................................150(c) <br />2. Certification ............................................. .........................................151(a) <br />3. Drainage ................................................... ............................150(6)-151(d) <br />4. Surfacing and Maintenance ...................... ............................150(e)-I51(d) <br />5. Reclamation ............................................. .........................................150Cf) <br />Signs & Markers .......................................................(816/81 <br />1. Si¢ns ....................................................... <br />2. Markers ................................................... <br />Backfilling & Grading ..............................(816/817.95-107) K <br />Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 L <br />Contemporaneous Reclamation ......................... .._............_.......100 <br />Approximate Original Contour ......................... .._...._.__..102(a)(1) I~ <br />Highwall Elimination ........................................ .................102(a)(2) 2. <br />Steep Slopes (includes downslope) ................... .........................107 lyl, <br />Handling of Acid & Toxic Materials ................. .....................102(c) <br />Stabitization (rills and gulies} ........................... ............._........95(6) <br />11(a),(b),(d),(e),&(f) <br />Distance Prohibitions .......................................................(761.11) <br />Revegetation ..................................................... (816/817.111-116) <br />Vegetative Cover .......................................................................11 I & I ] 6 <br />Timing ..............................................:................................................... 113 <br />Postmining Land Use ..............................................(816/817.133) <br />2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.