Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was an aerial inspection of the New Horizon Mine for the month of March, 2001. The purpose of this <br />inspection rs to conduct normal operations and environmental compliance <br />ROADS: All roads appear to be in excellent condition, The detour is functioning as designed. <br />HYDROLOGIC BALANCE: Mine 1: Ponds 1 and 6 had water in them but only 1 appeared to be <br />discharging as normal, all other ponds were dry. All ditches and culverts seem to be functioning as <br />designed. Mine 2 Pond 7 has water in it and Pond 8 is almost complete. <br />BACKFILL & GRADING: B & G was in progress as is normal. No problems were noted. <br />TOPSOIL: Not observed <br />GENERAL MINE COMPLIANCE The CC Ditch replacement HDPE is in place and ready for this years <br />irngation season <br />ice" ~. wW,~ ~~ ~ _ '~l <br />1 ~ _ ~ <br />'. <br />'~ 71ciY <br />L ~ ;7~ D <br />''yam. .~.".~_ - _'~;~,~,~_~~ <br />1 o ~~~ _ <br />_ - - _ - "~ <br />