Laserfiche WebLink
<br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />On January 20, 1995, a partial inspection was conducted at the permanently <br />reclaimed Bourg Strip Mine. Present during the inspection was Wally Erickson, the <br />new lead specialist for this mine. This winter has been dry; snow depths were shallow <br />and the south facing ridges were dry. The mine site was walked in a counter <br />clockwise direction starting at the entrance gate. The entrance to the mine was <br />signed appropriately. The permanent gully was walked past the permanent office <br />facilities pad. The permanent gully's rock check dams were intact and working. No <br />erosion was noted and the gully was vegetated. The reclaim around the east side <br />was walked and no concerns were noted. Mann Draw was walked; vegetation was <br />heavy and there was no indication that there was siltation from the mine site. <br />This mine was observed to be in compliance with the Rules and with the terms of the <br />permit. <br />