Laserfiche WebLink
• <br /> BOND RELEASE - 2 <br /> INSPECTION DATE: August 8, 1985 <br /> FILE NO. : M-74-52 <br /> COMMENTS AND RECOMMENDATIONS <br /> 1 . The lakes are completely mined out and the operator has requested that <br /> the total bond be adjusted accordingly. Some of the existing bond money <br /> will be applied to the new amendment acreage (approved July, 1985). <br /> 2. Lake areas must be sloped to 3H:1V, proper concrete buried, topsoil <br /> applied and revegetation completed. <br /> 3. The financial warranty can be decreased so that lake water surface areas <br /> are no longer bonded. Shore areas will require more work so financial <br /> warranty will be retained at a rate of $1 ,000 per acre of shore, plant <br /> area, roads and all other lands disturbed in the previously permitted <br /> (1974) area. <br /> 4. Submit a technical revision which clearly shows the present day <br /> condition of the previous permit (1974) area indicating lakes, roads, <br /> plant areas and all other aspects of the permit area. You should also <br /> include changes to the final reclamation plan such as home-site <br /> development. Include acreages for lakes and land. <br /> 5. The bond will be adjusted accordingly. <br /> 6. No annual report has ever been submitted for this permit, so technical <br /> revision should be prepared to satisfy the annual report requirements as <br /> specified in Rule 2.12 of the Minerals Rules and Regulations. <br /> 7. All overdue annual fees must be paid ($350/year) prior to any bond <br /> adjustment. <br /> THE MINED LAND RECLAMATION BOARD WILL CONSIDER BOND RELEASE/ADJUSTMENT FOR <br /> THIS PERMIT ON . PLEASE CONTACT THE DIVISION FOR <br /> DETAILS REGARDING TIME AND PLACE OF OARD CONSIDERATION. <br /> DB/ddt <br /> Doc. No. 2605F <br /> I <br />