Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the inspection. Comments <br />also describe any enforcement actions taken during the inspection and the facts or evidence supporting the enforcement action. <br />Jeny Nettleton (Nettleton) of Twentymile Coal Company (Twentymile) accompanied Byron Walker (Walker) <br />of the Colorado Division of Minerals and Geology (Division) during this inspection. After the joint <br />inspection, and as discussed with Nettleton, samples were taken at various locations outside the permit azea <br />from streams in the region and tested for conductivity, pH and temperature by Walker. Results are attached. <br />No new items of concern were identified during this inspection. Items of concern from previous inspections <br />include the following. See discussions regarding these items under inspection topic headings. <br />• Identification signs displayed at each entrance to the permit area from public roads (completed). <br />• Maintenance of topsoil storage markers (completed). <br />• Repair of the outlet of one of the four 18-inch corrugated metal pipes (CMP) at the switchback up onto the <br />working surface of the coal waste disposal site (completed). <br />• Clearance of partial blockage of roadside ditch at the east entrance to the Tipple 2 loadout tunnel <br />(completed). <br />• Uniformity of markers that delineate the perimeters of azeas affected by surface operations or facilities <br />markers [Rule 4.02.1(2)] (in work). <br />• Revision of page 2.03-37 of the Permit Application Package (PAP) to reflect current practices by Routt <br />County (County) with regard to the numbering of County Special Use Permits (in work). <br />• Cleazly indicating boundaries of areas authorized for disturbance on maps of the PAP (in work). <br />• Approved design of the sediment control measure for the temporary belt structure storage area (in work). <br />• Approved design of the sediment control measure for the CYCC office area (in work). <br />• Approved design of the sediment control measure for the "Trudy's" corner storage and training azea site (in <br />work). <br />• Protection of the topsoil storage pile at the North West Mains Ventilation Shaft (programmed). <br />• Maintenance of the sediment control measure at the # 7 North Escape Shaft (in work). <br />AVAILABILITY OF RECORDS <br />Page 2.03-37 of the PAP needs to be revised to reflect current practices by the County with regard to the <br />numbering of Routt County Special Use Permits. This item was first noted during the May 19, 2004 <br />inspection [Rule 2.03.10(3)]. The scope of a minor revision to update this administrative description was <br />discussed during this inspection. <br />C-1982-056. CP Inspection of August 12, 2004, Page 3 of 7 pages. BGW <br />