Laserfiche WebLink
III, COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken d'rring the inspection <br />and the facts or evidence supporting the enforcement action. <br />DITCH AND CHANNEL MEASUREMENTS AND COMPLIANCE EVALUATION <br />RSRDA North Perimeter Collection Ditch (segment between upper and lower terrace drain <br />inlets) <br />Measured Slope=35%; bw=4'; tw= 11'; d=23" ;riprap D50 appears to be 15"+. <br />Design specs for Ditch Segment "F" on Exhibit 6C: Slope = 25°k; bw=3'; tw=13.5'; <br />depth=3.5'; i8"D50 riprap. <br />Evaluation: Measured ditch appears to be steeper than Segment F design, with depth only <br />half of permit specification. However, there is some uncertainty regarding whether Ditch F <br />design is applicable to the RSRDA North Collection Ditch segment between terrace drain <br />inlets. This needs to be clarified, and a separate design for the North Side Collection ditch <br />should be provided if appropriate. This information will need to be provided and the <br />necessary construction certification for the North Collection Ditch will need to be provided <br />prior to the Phase 1 bond release inspection. <br />RSRDA North Perimeter Collection Ditch (steep segment below lower terrace drain inlet) <br />Measured Slope=31%; bw=4.5'; tw=12'; d=26"; riprap D50 appears to be 75"+. <br />Design specs for Ditch Segment "F" on Exhibit 6C: Slope = 25%; bw=3'; tw=13.5'; <br />depth=3.5'; 18"D50 riprap. <br />Evaluation: Measured ditch appears to be steeper than Segment F design, with depth <br />slightly over half of permit specification. However, there is some uncertainty regarding <br />whether Ditch F design is applicable to the RSRDA North Collection Ditch segment between <br />terrace drain inlets. This needs to be clarified, and a separate design for the North Side <br />Collection ditch should be provided if appropriate. This information will need to be provided <br />and the necessary construction certification for the North Collection Ditch will need to be <br />provided prior to the Phase 1 bond release inspection. <br />RSRDA North Perimeter Collection Ditch (low gradient segment between toe of pile and <br />Pond 8 downdrain <br />Measured Slope=7%; bw=3.5'; tw=8'; d=21"; riprap D50 appears to he 15"+. <br />Design Specs for Ditch Segment G on Exhibit 6C: Slope=2%; bw=3'; d= 1.5'; tw=9'; <br />9"D50 riprap. <br />Evaluation: Measured ditch appears to be steeper than Segment G design, but with <br />comparable capacity and larger riprap. Construction certification will need to be provided <br />prior to the Phase 1 bond release inspection. <br />RSRDA Borrow Area North Ditch Segment O <br />Measured Slope=l0%; bw=3'; tw=9'; d=2'; riprapped. <br />Design Specs: slope = 50°k; bw = 3'; d =1.1'; tw = 6.3'; riprapped. <br />Evaluation: Ditch segment as built appears to exceed design requirements. <br />17 <br />