Laserfiche WebLink
(Page 41 <br />MINE ID # OR PROSPECTING ID # M-1995-038 <br />INSPECTION DATE 7/3/02 <br />INSPECTOR'S INITIALS RCO <br />The following problems IPBI and/or possible violations (PV) land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The boundary markers were not observed, though they are required pursuant to Rule 3.1.12. g/ 12/ 02 <br />PB or PV: 36_ <br />TOPICISI: ~M <br />Corrective action: The operator must locate and install markers adeouate to delineate the - - - <br />boundarv. Evidence of boundary marker installation must be received by the Division by the dat <br />shown at right. <br />2. The topsoil is being degraded, though it must be protected for later reclamation of the site. 9/ 12/ 02 <br />PB or PV: 3B_ <br />TOPIC(S): SS_ <br />Corrective action: The operator must carefully remove all topsoil from areas immediately above th <br />hiphwalls. and strip a sufficient size of area ahead of the advancing hiahwalls, plus stockpile the <br />topsoil in the proper locations, according to the approved plan. A statement that this has been <br />accomplished and will continue must be received by the Division by the date shown at right. <br />3. The topsoil and subsoil are becoming infested with thistle, though they must be protected. 1 d 11/ 02 <br />Corrective action: The operator must provide evidence of the existence and implementation of a <br />noxious weed control plan. If no such plan presently exists. one must 6e written (with the help o <br />the county weed control officerl, and submitted. The submittal must be accompanied by a <br />statement that the plan will be followed. The submittal must be received by the date at right. <br />PB or PV: ,~~ <br />TOPICISI: ~~L <br />