Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Eastside Mine conducted by Erica Crosby of DMG. No <br />company representative was present during the inspection. The Eastside Mine is in reclamation <br />only status. The inspection involved viewing two aerial photographs taken by Harry Ranney of <br />DMG on August 12, 1997. <br />Hydrologic Balance The sediment pond appeared to be dry. The pond is well vegetated and <br />embankments appear stable. The ditch leading into the pond appears functional. No erosion <br />features were noted on the reclaimed slopes. The permanent drainage channel appears to be in <br />good repair. <br />Backfilling & Grading The backfilled and graded area showed no signs of instability or erosion. <br />The portal areas appeared stable. <br />Revegetation Vegetation on the mine site appears to be well established. This year represents <br />the second year growing season. <br />