Laserfiche WebLink
(Page 2) <br /> MINE ID # OR PROSPECTING ID # M-79-165 <br /> INSPECTION DATE 09/17/97 INSPECTOR'S INITIALS CLK <br /> OBSERVATIONS <br /> This inspection was conducted to verify that topsoil committed to site M-79-165 from sites <br /> M-77-011 (Miller Pit) and M-81-096 (Fernauld Pit) was present and adequate for reclamation <br /> of the site. Changes to M-79-165's reclamation status were also noted and will be used in the <br /> calculation of the current bond requirements. The following measurements were taken with a <br /> measuring wheel, compass, and Abney Level. <br /> >At the Fernauld Pit (M-77-011) : <br /> Two stockpiles. (1) 185'x5o'x7 '= 64, 750 CF= 2,398 CY <br /> (2) 410'x25'x5.51= 56,375 CF= 2, 088 CY <br /> Total : 4,486 CY. <br /> >At the Miller Pit (M-81-096) : <br /> One large stockpile, with two crests on it. I took measurements to determine the base and the <br /> two piles on top. <br /> Base measurements: Trapezoid, with length 330 ' and two widths, 175' and 1351 . The height was <br /> determined from the top, shooting downward across 15' at a 39 degree angle, to be 12 ft. The <br /> stockpile extends approximately Eft. beneath the visible ground surface, according to Steve <br /> O'Brian. A large area is missing from Pile #2; this is subtracted out of the total below. <br /> Base: [ (330'x 1351 ) + (3301x201x{2xl/2)) ]x (6'+ 12 ' ) = 920, 700 CF = 34, 100 CY <br /> Pile #1: 1351x50'x5.11= 34,425 CF = 1,275 CY <br /> Pile 42 : (2501x801xl0.21 ) - (90'x45'x5.l' ) = 183, 345 CF = 6, 790 CY <br /> Total: 42,165 CY. <br /> Total Topsoil at the Bromley Pit: 3,090 CY <br /> Total Topsoil at Miller & Fernauld Pits: 46,650 CY <br /> Total Topsoil required for Bromley Pit: 18,230 CY (11.3 acres x 1211TS) <br /> Total Topsoil required for Fernauld Pit: 24,200 CY (40 acres x 4.511TS) <br /> Total Topsoil required for Miller Pit: 13, 080 CY (13.9 acres x 7"TS) <br /> Total Topsoil needed at Bromley, Fernauld and Miller Pits: 55,510 CY <br /> Topsoil Deficit = 5770 CY <br /> This constitutes a possible violation of the permit, since this topsoil deficit raises the <br /> bond on the Bromley Pit by $37, 500.00, the amount needed to buy the topsoil required to <br /> complete reclamation. (See PV1) <br /> I & E Contact Address cc: Carl B. Mount, DMG <br /> ❑ CE <br /> NAME Al Frei ❑ BL <br /> OPERATOR Al Frei & Sons Inc. ❑ FS <br /> STREET 11521 Brighton Road ❑ HW <br /> CITY/STATE/ZIP Henderson CO 80640 ❑ HMWMD (CH) <br /> ❑ SE <br /> CERTIFIED MAIL NO.:� a�3 �� � ❑ wQCD (CH) <br /> RETURN RECEIPT REQUE$Tt Q ❑ EPA <br /> Steve O'Brian <br /> Environment Inc. <br /> 7985 Vance Drive, Suite 205A <br /> Arvada, CO 80003 <br />