Laserfiche WebLink
Significant storm runoff during the last 30-60 days has delivered a substantial amount of sediment <br />to the pond. Poor hydrologic cover and the lack of live vegetation due to the extended drought is <br />likely a contributing factor to the large amount of sediment that has accumulated in the pond <br />during the last year. The operator should evaluate the sediment level in the pond and take the <br />necessary measures to ensure that the pond has the capacity to treat nrnoff to effluent limitations <br />imposed by the CDPS discharge permit. <br />Slides and Damaoe <br />Other photographs reviewed of the reclaimed area indicate rill and gully formation continues, <br />especially on the refuse slope. Contour furrows will likely require maintenance in the near future. <br />4 ~ <br />.. <br />~~ .. <br />~~ `~.• <br />~1 ~`_ <br />~~ -.. <br />1. ` _ = ~ = <br />~~ a~~ `~ ~~ -~ <br />Page 4 <br />Overall, the site appeared in fair condition. <br />