Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Arness McGriffin Mine conducted by Tom Gillis of the Colorado <br />Division of Minerals and Geology. <br />Roads <br />The ground was dry at the time of the inspection. DOW has cabled the entrance road leading to the site, <br />therefore there should be little vehicular traffic and wear and tear on the road surface until next spring. <br />General Mine Plan Compliance <br />No problems were evident at the site beyond the usual disturbances to the surface ofthe unimproved access <br />road which traverses the mine bench. <br />