Laserfiche WebLink
- U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person TRAPPER MINING, INC. Number C-010-81 Date 06/20/2007 Continuation Page <br />28. Performance <br />3=Nat Planned, 4=Not Started, 5~ <br />A. Administrative <br />L _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. AML Rec. Fees --Non-Respondent <br />8. _~ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. Inspections & Certifications <br />3. Siltation Structures <br />4. Discharge Structures <br />5. Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8.~ Swface Water Monitoring <br />9. Drainage -- Acid-Toxic Materials <br />10. Impoundments <br />1 L~ Stream Buffer Zones <br />C. Topsoil & Subsoil <br />]. Removal <br />2. Substitute Materials <br />3._ Storage and Protection <br />Backflling & Grading <br />1. 1 Exposed Openings <br />2. I Contemporaneous Reclamation <br />3. 1 Approximate Original Contour <br />4. 1 Highwall Elimination <br />5. 1 Steep Slopes (includes downslope) <br />6. 3 Handing of Acid & Toxic Materials <br />7. 1 Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1. Placement <br />2. Drainage Control <br />3. Surface Stabilization <br />4. Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1. Drainage Control <br />2. Surface Stabilization <br />3. Placement <br />4. Inspections and Certifications <br />5. Impounding Structures <br />Use Of Explosives <br />1. Blaster Certification <br />2. Distance Prohibitions <br />3. Blast Survey/Schedule - <br />4. Warnings & Records <br />5. Control of Adverse Effects - <br />D. <br />E. <br />F. <br />G. <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br /> Administrative ................................. ........................................ <br />I. Valid Pemrit ................................................... ..................................773.11 <br />2. Mining within Bonded Area ................. ...............................773.11 <br />3. Teens & Conditions of Permit .............. ...............................773.17 <br />4. LiabiliTy Insurance ................................. ...............................800.60 <br />5. Ownership and Control .......................... ..............................778.13 <br />6. Temporary Cessation ............................. .842.11(e) & 816/817.131 <br />7. AML Rec. Fees --Non-Respondant ....... .........................870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ........... ..........................870.15(a) <br />Hydrologic Balance .......................... ............(816/817.41-57) <br />1. Drainage Con[rol .................................... .....................................45 <br />2. Inspections &Certifications .................. ...........................49(a)(10) <br />3. Siltation Structures ................................ ......................................46 <br />4. Discharge Structures ............................. ......................................47 <br />5. Diversions .............................................. .....................................43 <br />6. Etiluent Limits ....................................... .....................................42 <br />7. Ground Water Monitoring ..................... .................................41(c) <br />8. Surface Water Monitoring ..................... .................................41(e) <br />9. Drainage--Acid -Toxic Materials .......... .................................41(t) <br />10. lmpoundments ....................................... .....................................49 <br />] 1. Stream Buffer Zones .............................. .....................................57 <br />A. <br />B. <br />C. <br />Topsoil &Subsoil ...............................................(816/817.22) <br />I. Removal ............................................................ ......................22(a) <br />2. Substitute Materials ........................................... ......................22(c) <br />3. Storage and Protection ....................................... ......................22(c) <br />4. Redistribution .................................................... ......................22(d) <br />Backfilling & Grading .............................. (816/817.95-107) <br />I. Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 <br />?. Contemporaneous Reclamation .......................... ........................100 <br />I. Approximate Original Contour ........................... ...............102(a)(1) <br />. Highwall Elimination .......................................... ...............102(a)(2) <br />. Steep Slopes (includes downslope) ..................... .......................107 <br />. Handling of Acid & Toxic Ma[erials .................. ....................102(c) <br />. Stabilization (rills and eu]lies) ............................ 4 <br />5 <br />6 <br />......................95(61 <br />7 <br />D <br /> <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ............................................................... ............................71(e) <br />2. Drainage Control ................................................... ............................71(f) <br />3. SurfaceStabilization .............................................. .............................71(g) <br />4. Inspections & Certifica[ions ................................... ............................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(g16/817.8]-84) <br />1. Drainage Con[rol ................................................... ............................83(a) <br />2. Surface Stabilization .............................................. ............................83(6) <br />3. Placement ............................................................... ............................83(c) <br />4. Inspections and Certifications ................................ ...........................83(d) <br />5. Impounding Structures ........................................... ................................84 <br />G. Use of Explosives ..................................................(816/817.61-68) <br />I. BlasterCertification ......................................... ..................................61(c) <br />2. Distance Prohibitions ....................................... ..................................61(d) <br />3. Blast Survey/Schedule ...................................... .................................62-64 <br />4. Warnings & Records ........................................ ..............................66 & 68 <br />5. Control of Adverse Effects ............................... ......................................67 <br />H. Subsidence Control Plan .........................................(817.12]-122) <br />1. Roads ................................ .................................(816/817.150-151) <br />1. Road Construction ................. ..........................................................150(c) <br />2. Certification ........................... ...........................................................I51(a) <br />3. Drainage ................................. ..............................................150(6 -151(d) <br />4. Surfacing and Maintenance .... ..............................................I50(e -151(d) <br />5. Reclamation ........................... ...........................................................1500 <br />J. Signs & Markers .......................................................(816/817.11) <br />1. Signs ...................................... ...............................................I l(a),(b),&(c) <br />2. Markers .................................. ....................................11(a),(b),(d),(e),&0 <br />K. Distance Prohibitions ..... ..................................................(761.11) <br />L. Revegetation .................... .................................(Sl6/817.111-116) <br />1. Vegetative Cover ................... ....................................................111 & 116 <br />2. Timing ................................... ...............................................................113 <br />M. Postmining Land Use ..............................................(816/8]7.]33) <br />2 of <br />Elsewhere, 6=Previously Cited <br />H. _Subsidence Control Plan <br />I. Roads <br />1. Road Construction <br />2. Certification <br />3. Drainage <br />4. Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1._ Signs <br />2. Markers <br />K. _Distance Prohibitions <br />L. Revegetation <br />]._ Vegetative Cover <br />2. Timing <br />M. _Postmining Land Use <br />N. Other <br />General <br />Performance <br />Catagory <br />D ] I)special focus evaluation <br />