Laserfiche WebLink
• <br />(Page 5) <br />MINE ID # OR PROSPECTING ID # M-80-228 <br />INSPECTION DATE 1-6-98 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) and/or possible violations (PV) (and suggested <br />corrective actions) were identified during this inspection. The problems <br />should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given <br />to reduce their severity when considered by the Mined Land Reclamation Board. <br />The inspector noted on the previous page should be notified of all corrective <br />actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />B `L~2 <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Unpermitted permanent crushing facilities being 1-30-98 <br />constructed on site. PB or PV:p~ <br />TOPIC(S): <br />CORRECTIVE ACTION $~ <br />Submit appropriate revisions to incorporate this <br />structure into the permit, as indicated in the body of <br />this report, by January 30, 1998. <br />2. No mine identification sign noted at entrance to site. 1-30-98 <br />PB or PV:p$ <br />CORRECTIVE ACTION TOPIC(S):$~ <br />Install a mine identification sign, in compliance with <br />Rule 3.1.12, by January 30, 1998. <br />3. Powerline through the site is not identified in the 1-30-98 <br />permit. PB or PV:p~ <br />TOPIC(S):A$ <br />CORRECTIVE ACTION <br />Provide corrective actions, as indicated in the body <br />of this report, to correct this problem by January 30, <br />1998. <br />C~ <br />