My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC21744
DRMS
>
Back File Migration
>
Inspection
>
INSPEC21744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:22:06 PM
Creation date
11/18/2007 9:41:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Inspection
Doc Date
11/20/2001
Doc Name
COAL INSPECTION REPORT
Inspection Date
11/15/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />Site sedimentation Ponds 002, 003, 004, 008, the Pecoco, and the Truck Wash Ponds were <br />inspected. Site sedimentation ponds 003 and the Truck Wash Holding Pond were full and <br />dischazging clear water. All other site ponds were retaining water but not discharging. Pond <br />inlets and embankments appeared stable and no problems were noted at any of the pond <br />locations. <br />Backfill & Gradine <br />Several remaining areas at the site require backfill and grading. These include the Wadge East <br />Pit Area, a small area surrounding PM-5, and a topsoil stockpile location north of Road F1. A <br />large area of backfill and grading has recently been completed south of the Wadge Impoundment. <br />This area south of the Wadge Impoundment has been topsoiled, hydromulched and seeded. <br />Several remaining roads at the mine site will require topsoiling and seeding. <br />As discussed with SCC and representatives of Montgomery Watson Hazza, SCC will file an <br />application with the Division requesting a delay in contemporaneous reclamation for the <br />remaining areas to be backfilled and graded. This application will include a revised backfill and <br />grading schedule. Revised timeframes for completing all remaining reclamation activities <br />(postmine drainage channel construction and road reclamation) will also be provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.