Laserfiche WebLink
<br />III. COMMENTS-COMPLIANCE ~ok/~'1Fjp,~u C~-QI-0Iy <br />P6 ~a ~ ~~&c!~'~vof cZSU~ <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />REVEGETATION/RECLAMATION SUCCESS: The "old" revegetation on the refuse pile is in good <br />condition. The strip that was reseeded early last spring also appears to have grown nicely <br />over the past summer. The portion of the refuse pile that was just covered and reseeded is <br />growing nicely. The vegetation at the loadout appears to be in good condition (it looks like <br />that of the surrounding areas). <br />Miscellaneous: <br />- It appears that the Operator is continuing to remove scrap material from the bone-yard by <br />Pond 2. Most of the junk cars and old tractors have been removed, as well as some of the <br />miscellaneous debris. There is a new pile of debris that has been cleaned out of the mine. <br />-There are about 10 piles of coal/coal fines that have been scraped off of the ground in the <br />area of the clean and raw coal stockpiles. It has been said that these stockpiles will either be <br />sold or moved to the refuse pile. <br />-The Operator continues to remove equipment from the mine for sale prior to reclamation. <br />- AI Weaver has indicated that they may start demolition activities this fall. <br />