Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection The comments include discussion of observations made during the <br />inspection Comments also describe any enforcement actions taken during the inspection and the facts or evidence <br />supporting the enforcement action <br />This was a complete inspection of the Blue Flame Coal Mme for the month of March, 2004. The site is reclaimed <br />and the weather clear. <br />Hydrologic Balance: The site ~s very stable due to the excellent stand of vegetation (see photo). <br />General Mine Compliance: The only problem on site is a small hole, probably started by a badger, that has open up <br />a path to the otd mme adit (see photo 2) which wdl be repaired sometime ~n Apnl or May <br />