My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC21513
DRMS
>
Back File Migration
>
Inspection
>
INSPEC21513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:56 PM
Creation date
11/18/2007 9:40:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Inspection
Doc Date
3/28/2007
Doc Name
Insp Rpt
From
DRMS
To
CEMEX, Inc.
Inspection Date
3/20/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 2) <br />MINE ID # OR PROSPECTING ID # M-1977-208 <br />INSPECTION DATE 03/20/07 INSPECTOR'S INITIALS ESC <br />OHSSRVATION3 <br />This was an inspection of the Lyons Quarry conducted by Erica Crosby, Carl Mount and David <br />Bird of the Division of Reclamation, Mining and Safety. Monica Sowdera, Pat Fisher and <br />Stephano Demartin of CEMEX, inc. and Alan Notary of Brown and Caldwell were present during <br />the inspection. The purpose of the inspection was to monitor the backfilling of the C-Pit <br />and discuss the new piezometers and monitoring wells proposed on site. <br />The Division met with CEMEX personnel and their consultant to discuss a new monitoring <br />plan that was requested by the Division to address water quality and monitoring of C-Pit <br />water. CEMEX has recently installed an automatic level recorder in the C-Pit and the <br />existing monitoring well CEM-001 to measure water elevation (head), pH, dissolved oxygen, <br />oxygen reduction potential and conductivity. The intent is to determine the recharge rate <br />and fluctuation from the waters in the C-Pit and the existing well completed in the Fort <br />Hayes Formation (CEM-001). According to the operator, it takes approximately 68 hours for <br />well CEM-001 to recharge. <br />To determine the source(s) of water in the C-Pit and to accumulate additional water data, <br />CEMEX proposes 5 additional piezometers and 3 additional monitoring wells in proximity to <br />the pit. The piezometers will be installed around the western end of the C-Pit and the <br />monitoring wells will be installed on the eastern end of the pit. Two of the monitoring <br />wells will be completed into the shale unit and a final monitoring well will be installed <br />into the alluvium. Surface water gauging locations are also proposed on the Boulder <br />Feeder Canal and the Swede Ditch to determine if the ditches are leaking water and <br />migrating into the C-Pit. A copy of the proposed map noting the location of the sites is <br />attached. The operator intends on filing such changes in the form of a revision to the <br />permit. <br />The Division observed material being hauled in from existing stockpiles on site to <br />backfill portions of the C-Pit. Approximately 7-e scrapers were noted dumping material on <br />the northwest portion of the pit. Two dozers were pushing the material into C-Pit. <br />Patches of cement kiln dust {CKD) were noted in C-Pit and possibly exposed to wind <br />erosion. CEMEX will need to ensure that the CKD is covered during the backfilling project <br />and not be subject to wind erosion. <br />The Division observed the stockpile/borrow source actively being used to backfill the C- <br />Pit. The material is mainly historic waste rock consisting of shale. The size of the <br />material varies from 5" minus to small boulders. <br />I & 8 Contact Address <br />NAME Ms. Monica Sowders <br />OPERATOR <br />STREET <br />CEMEX, Inc. <br />5134 Ute Hwv <br />CITY/STATE/ZIP <br />Lyons, CO 80504 <br />^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />Cc: Carl Mount; DRMS <br />David Bird; DRMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.