Laserfiche WebLink
(Page 2) <br />MINE ID # OR PROSPECTING ID #: ~~-~nnn_nnn <br />INSPECTION DATE: £t/~n/m INSPECTOR'S INITIALS: KAP <br />OBSERVATIONS <br />This inspection was conducted in response to a succession of operator application received by the <br />Division of Reclamation, Mining, and Safety. Present at the inspection were Kate Pickford, DRMS, and <br />Gayle Lyman, Elam Construction, Inc. Weather at the time of the inspection was clear, calm, and <br />approximately 70 degrees. <br />2. Phases 1, 2, and 3 at the site have been mined out and are being used as the process and stockpile <br />area. This portion of the site consists of approximately 12 acres of disturbance. Mining has commenced <br />in phase 7. Other phases of the operation have been put on hold due to limited resources and difficulty <br />in acquiring the gravel in these areas. <br />3. Mr. Lyman stated that an amendment to this permit will be submitted to the Division soon to add <br />acreage to the permit. This site is operating according to the approved plan and a new bond amount <br />will be calculated, relative to the change in operator. <br />I & E Contact Address Cc: ^ CE <br />^ BL <br />NAME; Harold Elam ^ FS <br />^ HW <br />OPERATOR: Elam Cosntruction Inc ^ HMWMD (CH) <br />STREET: .SSG Struthers Ava ^ SE <br />^ WQCD (CH) <br />CITY/STATE/ZIP: Grand lunctinn C'n R15n1 ^ Other <br />