My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC21074
DRMS
>
Back File Migration
>
Inspection
>
INSPEC21074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:39 PM
Creation date
11/18/2007 9:38:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
5/23/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL MINE PLAN COMPLIANCE <br />The operation is in compliance with the general mine plan. Longwall mining had reached the 20-Right <br />gateroad (headgate). Development was at Station 95+00 in the 20R headgate. The Longwall had been set up in <br />the 19 Right Panel. <br />Low quality coal was being placed in the storage azea, and then washed in the wash plant. Coal mine waste <br />was being hauled to the waste disposal area. <br />Coal was being shipped by truck and by rail. <br />REVEGETATION <br />Long-term mining disturbed azeas require eventual revegetation in the reclamation plan. No seeding of <br />reclaimed disturbed areas has been reported to date. <br />Exposed soil in operational areas needs temporary vegetation or other type of cover. Examples are the road <br />cuts and embankments, road ditches, cut and fill slopes, new topsoil piles, and boazder azeas of operational <br />sites. Whitetop is beginning to grow in such areas. See Rules 4.03.2(3)(d)(ii), 4.03.2(3)(d)(x), and <br />4.03.2(4)(6). <br />EXCESS SPOIL & DEVELOPMENT WASTE <br />Materials excavated during sinking of 6 North Mains Ventilation Shaft were being placed in the pit prepazed <br />for that purpose. <br />RECLAMATION SUCCESS <br />There has been no reclamation bond releases processed at the Foidel Mine site. <br />C-1982-056. CP Inspection of 23 May 2006 Page 6 of 7 pages. BGW <br />
The URL can be used to link to this page
Your browser does not support the video tag.