My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC20970
DRMS
>
Back File Migration
>
Inspection
>
INSPEC20970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:35 PM
Creation date
11/18/2007 9:37:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
9/13/2000
Doc Name
COAL INSPECTION REPORT
Inspection Date
9/7/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i I <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection conducted by Joe Dudash of the Colorado Division of Minerals and <br />Geology. Bill Bear represented the operator. <br />Facilities <br />The.consttuction of the downhill conveyor and truck loading facilities continues. The work is <br />about 40 percent complete. The sections of conveyor tunnel that ]ie underground have been <br />completed. <br />f. <br />Hvdroloev <br />There was very little water in pond B. A small amount of coal fines found their way into the <br />pond. The operator has not installed the guazd rail between pond B and the old highway 133 yet. <br />Pond D was dry. The water level in pond C was just above the primary tube. Pond embankments <br />and pond inslopes appeared to be stable. <br />The collection ditch, culverts and silt fence at the mine site entrance azea were all functional. <br />Gob Pile <br />There were a few small gob piles to the back of the gob pile. The operator will grade and <br />compact them later. There was positive drainage on top of the gob pile. The underdrain opening <br />was exposed. The Swale and culvert at the entrance to the gob pile were functional. <br />Roads <br />The paved haul road section that had been temporarily diverted for the construction of one <br />conveyor tunnel section has been resumed to its original position. <br />The gob pile haul road was in good condition. <br />c: Uns971bowie2~ nsp0900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.