Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the New Horizon Mine for the month of May, 1998. <br />AVAILABILITY OF RECORDS: Records were inspected and found to be complete and <br />satisfactory. See page 5 of this report for more details. <br />HYDROLOGIC BALANCE: Mine 1 : Ponds 1 and 6 had water in them but only 1 was discharging <br />as normal, all other ponds were dry. All ditches and culverts are functioning as designed. Mine <br />2: Pond 7 had water in ti but was not discharging. All ditches and culverts were clear and <br />capable of functioning as designed. The site for pond 8 was observed for problems that may <br />arise. <br />BACKFILL & GRADING: B & G was in progress as is normal <br />EXPLOSIVES: Records were complete, accurate, and up to date. A blast was observed and no <br />problems were noted. Dust was minimal and the blast noise was hardly noticable. <br />TOPSOIL: The topsoiling for this year had just been completed and another will commence again <br />sometime in Janurary. <br />RECLAMATION SUCCESS: Vegetation continues to do well. The growing season is over and the <br />site shows no signs of any rills or gullies. <br />