Laserfiche WebLink
<br />MINE ID # OR PROSPECTING <br />INSPECTION DiaTE 08/19/98 <br />ID # M-87-097 <br />(Page 4) <br />INSPECTOR'S INITIALS_RS,Q_ <br />The following problems (PB) and/or possible violations (PV) (and suggested <br />corrective actions) were identified during this inspection. The problems <br />should be corrected by the dates given, or they will become possible <br />violations.. The possible violations should be corrected by the dates given <br />to reduce their severity when considered by the Mined Land Reclamation Board. <br />The inspector noted on the previous page should be notified of all corrective <br />actions taN:en. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />CORRRCTIVS ACTIONS <br />There were no permit boundary markers observed which <br />would sufficiently delineate the boundary, nor a <br />permit ID sign, though they are required to be placed <br />pursuant to Rule 3.1.12. <br />The operator must mark the boundary or boundary <br />corners of the permit area, and post a sign containing <br />the required information, as specified in Rule 3.1.12. <br />The operator must provide proof of having performed <br />these actions, by submitting a letter and photos to <br />the Division, by the date shown at right. <br />2. The operator is not salvaging topsoil for use in <br />reclamation, though the approved mining and <br />reclamation plans state thaC such is to be performed <br />The operator must commence with salvaging all topsoil <br />which is disturbed by mining, as described in the body <br />of this report, by stripping and stockpiling it <br />separately. If the volumes of such material are shown <br />to be insufficient for reclamation, then the operator <br />must either salvage clay or other overburden material <br />which could support revegetation or import topsoil <br />from other sources. <br />A statement of the operators commitment to such <br />topsoil salvage must be submitted to this office. <br />This statement must include details of the depth of <br />soil l+~yer to be stripped, resulting volumes of <br />material and stockpile placement locations. This <br />statement must be received by the date shown at right. <br />3. none. <br />CORRECTION <br />DATE <br />9/30/98 <br />PB or PV:PB <br />TOPIC(S):SM <br />9/30/98 <br />PB or PV:PB <br />TOPIC(S):TS <br />PB or PV: <br />TOPIC(S): <br />