<br />MINE ID # OR PROSPECTING ID# <br />INSPECTION DATE: 9-26-00 <br /> <br />M-1977-493 PAGE: 5 <br />INSPECTOR'S INITIALS: ACS <br />compares the costs for channel reconstruction, regrading, and topsoiling in the Storke <br />Yard as estimated by the DMG in 1998, by Climax in 1999, and as estimated by the DMG <br />relative to the current site conditions under two scenarios that are discussed in <br />detail below the table. <br />I STORRE COMPLEX RECLAMATION COST ESTIMATES NOT INCLUDING REVEGETATION <br />DMG task # and DMG 1998 Climax 2000 estimate, grade 2000 estimate, backf ill <br />description estimate 1999 Ark. R. cut mat'1 Ark. R. cut @ 7-shaft 6 <br /> estimate in-place Storke portal areas <br />7. Excavate Ark. R. $80.560 $81,517 $'77,481 $256.94`_ <br />channel <br />7a. Riprap $14,664 $14,664 $14,664 $14,664 <br />7b. Riprap bedding $2,482 $2,482 S2,482 $2,482 <br />7c. Eackfill & grade Included Included $54,063 Included in #7 <br />Ark. R. cut material in #7&10 in #7&10 <br />8. Finish grade $2,404 $2,349 $2,280 $2,280 <br />reconstructed channel <br />10. Eackfill & rough $106,131 $104,452 $6,774 Included in #7 <br />grade Storke Complex <br />11. Finish grade $12,015 512,107 $2,090 $2,09C <br />Storke Yard <br />12. Topsoil from Ark. $9,529 $8,317 $7,266 $7,265 <br />R. stockpile <br />13. Topsoil from $11,566 $6,348 $8,438 $8,438 <br />Fremont stockpile <br />14. Topsoil from 561,871 $60,604 Not needed, 46 acres Not needed, 46 acres <br />McNulty stockpile already seeded already seeded <br />TOTALS $301,322 $292,930 $175,543 $294,165 <br />The two new reclamation cost scenarios for the Storke Yard are summarized in the <br />columns on the right half of the table. The first scenario assumes that the <br />approximately 128,000 cubic yards of cut generated in the Arkansas River <br />reconstruction project can be graded and blended into the reclaimed topography <br />immediately adjacent to the reconstructed channel. The second scenario assumes that <br />the Arkansas River cut material will be hauled to the opposite side of the Storke Yard <br />and backfilled into the Storke Portal area and the slope below 7-shaft. The estimated <br />cost differential of these scenarios is $118,622.00 due to the haul distance involved. <br />Based on qualitative observations by the DMG in the Storke Yard, it is not likely that <br />the Arkansas River cut material can be graded in-place without adversely impacting <br />the quality of reclamation in the vicinity of the reconstructed channel. However, <br />there appears to be ample room in the 7-shaft area to waste the 128,000 cubic yards <br />of cut, and the backfilling of this material below 7-shaft may in fact enhance the <br />reclamation potential in this area. Unless Climax can demonstrate that the first <br />scenario is feasible, DMG will assume that the second scenario will be employed as <br />the basis for cost estimating and the determination of the final bond amount to be <br />established under revision SR-03. The appurtenant worksheets and cost calculations <br />for the new estimates are enclosed with this inspection report. <br />The E-dump complex facing Highway 91 was inspected. The approved reclamation plan <br />for this area calls for grading of the uppermost bank slopes of the dump to 2.5:1 to <br />3:1 "where practical and feasible" (1984 amendment AM-02). The approved plan <br />