My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC20782
DRMS
>
Back File Migration
>
Inspection
>
INSPEC20782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:27 PM
Creation date
11/18/2007 9:36:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Inspection
Doc Date
1/29/2001
Doc Name
Insp Rpt
From
DMG
To
Climax Molybdenum Company
Inspection Date
9/26/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MINE ID # OR PROSPECTING ID#: M-1977-493 PAGE: 3 <br />INSPECTION DATE: 9-26-00 INSPECTOR'S INITIALS: ACS <br />• Commit to a limitation of 4-foot maximum cover fill thickness over the slab. <br />• Figure 29 provided with the SR-03 application is described as an "as-built" <br />drawing. However, the drawing is dated 6-30-96 whereas the project was <br />constructed beginning on ~-1-96 and ending 9-30-96. Please provide a <br />certification, as described in Rule 7.3.2(21 of the Hard RocklMetal Mining Rules, <br />for the 7-shaft seal, or provide an as-built report certified by the project <br />engineer or manager. <br />• Provide a description of any evaluations, observations, or testing that was done <br />on the shaft collar to determine that it would be an adequate footing for the <br />slab. <br />• Provide an evaluation of the influence or lack of influence the use of 30 foot long <br />wide flange beams over the center of the 28 foot shaft opening may have on the <br />stability of the case-in-place slab as opposed to 32 foot long beams that would <br />be employed under IMP specifications. <br />• Test or otherwise evaluate the cast-in-place concrete slab and provide a <br />demonstration that the specified compressive strength specification has been met. <br />• Describe how the steel wide flange beams were treated to resist corrosion. <br />The reclaimed portions of the Storke Yard were inspected. Extensive building <br />demolition was completed in the Storke Yard during 1994. Inert debris disposal from <br />the demolition project occurred in a disposal trench as approved by the DMG in <br />consultation with the Colorado Hazardous Materials and Waste Management Division. The <br />disposal trench included a compacted soil liner and leachate management system that <br />appears to be functioning in accordance with the design intent. The leachate from <br />the disposal trench is routed to the Storke Waste Water Treatment Plant. The <br />remaining buildings in the Storke area include the 5-shaft head frame and the <br />wastewater treatment plant. There are also some foundations to be reclaimed in the <br />7-shaft area as discussed previously, and in the concrete batch plant location where <br />a backhoe was pulling up concrete foundation slabs on the day of this inspection. If <br />Climax determines that the 5-shaft head frame should be left as a permanent feature <br />in the reclaimed area, the permit must be modified to .remove the demolition <br />requirement for this structure in accordance with Rule 3.1.11. <br />The higher ground in the southeast part of the Storke Yard, above the primary storm <br />water management ditch, has been graded to between 5 and 10:1. Some small-scale <br />ponding of water is occurring in the regraded area; this is caused by water flowing <br />in from the wetlands above. The regraded surface was left in a roughened and <br />undulating condition with some medium to large sized boulders scattered throughout. <br />The topography that has been created will provide a variety of microclimates to <br />promote plant growth and diversity, and will provide cover for wildlife. The wet <br />areas may eventually develop high quality wetlands similar to those in the adjacent <br />undisturbed areas. The soil and subsoil present at the surface has been directly <br />seeded with no application of stockpiled topsoil or other growth media. Climax <br />determined that the application of topsoil or other cover fill would not be necessary <br />since this part of the Storke Yard was used as a borrow area; there is no mine waste <br />or development rock in this area so the limited available stockpiled topsoil could <br />be more effectively used for other reclamation projects at the mine. Tree and shrub <br />tublings have been planted. The revegetation effort in this area is doing well, but <br />does not yec meet the performance standards of Rule 3.1.10. The DMG will reduce the <br />surety held for grading in this area as requested by Climax in the SR-03 application. <br />Some mining debris was noted at the surface of the regraded area, primarily rebar <br />
The URL can be used to link to this page
Your browser does not support the video tag.