My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC20782
DRMS
>
Back File Migration
>
Inspection
>
INSPEC20782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:27 PM
Creation date
11/18/2007 9:36:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Inspection
Doc Date
1/29/2001
Doc Name
Insp Rpt
From
DMG
To
Climax Molybdenum Company
Inspection Date
9/26/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Truck/Loader Team Work conCd Task # : 78 sheet 2 of 2 <br />Loading Tool Cvele Time : Number of loading tool passes required to fill truck : 6 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : AVERAGE <br />-selected value within basic rating : AVERAGE <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : NA minutes <br />Cycle Time Factors Loading Conditlon Description ~ Factor (min.) ~ Source <br />Material :~NA ~ NA ~ NA <br />Stockpile NA NA ~ NA <br />Truck ownership :ANA ~ NA NA <br />NA <br />Dump target 1NA ~ NA ~ NA <br /> Net cycle time adjustment : NA minutes <br /> Adjusted basic cycle time : 0.419 minutes <br />Net load time per truck (bulk of first loader pass com pleted dudng truck exchange) : 2.195 minutes <br />Truck Cvcle Tlme <br />Truck exchange time: 0.50 minutes....... <br />. Ad'{ustad for site altitude : <br />0.56 <br />minutes <br />Truck load time: 2.195 minutes........ Adjusted for site altitude : 2.55 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 1.01 minutes <br />Truck travel (haul & return) time: <br />Road condition description :Rutted dirt, little maintenance, no water, 1' Lire penetration <br />Haul route <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (!) Rolling <br />res. (°I) Total <br />resistance (I) Speed <br />feeUminute Travel Ume ' <br />(minutes) <br />1 1,875 1.90 4.00 ~ 5.90 1549 1.29 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route :~ ~ - Haultime": 1.45 <br />1 1,875 -1.90 4.00 2.10 3360 0.75 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />• lirsl an0last segments sOjusted for acreleratioNLeceleretion Return time " <br />lime anawn mcmees auitutle aaiunmem Total truck cycle time <br />Loading tool unit production : 286.12 LCYlhour...... Adjusted for job efficiency <br />Truck unit production : 138.62 LCY/hour...... Adjusted for job efficiency <br />Optimal no. trucksAoading tool : 2 trucks........... Selected no. trucksAoader <br />Adjusted hourly truck team production <br />Adjusted hourly single trucWloader team production <br />Adjusted hourly multiple truck/loader team production <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Team(s) <br />51.652 tLCY <br />0.85 <br />6.43 <br />23748 <br />115.06 <br />2 <br />230.11 <br />230.17 <br />230.17 <br />Total job time : 675.85 <br />Total job cost : 5256,945 <br />ninutes <br />minutes <br />minutes <br />LCYmour <br />LCY/hour <br />trucks <br />LCY/hr <br />LCYlhr <br />LCY/hr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.