Laserfiche WebLink
4.a. For each refuse area, list the status of reclamation (compaction, cover, topsoil, <br />revegetation). ~'n <br />Topsoil <br />1. How large is the area ahead of the active mining area where topsoil has been removed? <br />A Pik ~ ~ o~.res <br />'P~ P~{- - 30 ~-re,5 <br />D Pik- lo~~ <br />2. What is the approximate area of graded areas where topsoil has not been redistributed? <br />~c~ a Pik lenc~-(yv~ <br />3. List topsoil stockpiles and their location. <br />Revegetation <br />1. How much area ahead of the pit and topsoil removal areas has been brushed? <br />