Laserfiche WebLink
- <br />ESTIMATING FORM - REVEGETATION YORK cont'd Filename N015-7 sheet 2 of 2 <br />B. SHRUB & TREE TRANSPLANTS <br />_________________ ___________ ~ ~ MATERI AL:I PLANTING: ~ f/PERT. ~ TOTAL ~ TOTAL <br />SPECIES NAME ~ WAN./ACRE ~ STOCK TYPE 8 SIZE ~ f/PLANT ~ S/PLANT ~ PELLET ~ f/PLANT ~ f/ACRE <br />Choke cherry ~ 25 ~ Tabling... 10-13 cu.in. ~ f0.72 ~ f0.60 ~ NA ~ f1.32 ~ f33.00 <br />Skunkbush surer ~ 25 ~ Tabling... 10-13 cu.in. ~ f0.72 ~ 50.60 ~ NA ~ f1.32 ~ f33.00 <br />Hanson Hedgerose ~ 25 ~ Tubl irg.-. 10-13 cu.in. ~ 50.72 ~ 50.60 ~ NA ~ 51.32 ~ f33.00 <br />American Pl un ~ 25 ~ Tabling.-- 10-13 cu.in. ~ 50.72 ~ 50.60 ~ NA ~ 51.32 ~ f33.00 <br />Common heckberry ~ 22 ~ Tabling... 10-13 cu.in. ~ 50.72 ~ 50.60 ~ NA ~ 51-32 ~ f29.04 <br />Plains cottonwood ~ 21 ~ Tabling.-. 10-13 cu.in. ~ f0.72 ~ f0.60 ~ NA ~ f1.32 ~ f27.72 <br />Boxelder ~ 21 ~ Tubling•-- 10-13 cu.in. ~ f0.72 ~ 50.60 ~ NA ~ 51.32 ~ f27.72 <br /> Total tramplant cost/acre: (216.48 <br />C. SEEDBED PREPARATION =___________ <br />Tilling method p1: chisel plowing <br />p2: <br />D. SEED APPLI CA7I ON <br />Seeding method: drill seeding <br />(53.95 <br />Total cost/acre: 553.95 <br />Total cost/acre: 560.23 <br />E. FERTILIZING <br />__________ ____ PERT ILI2ER j SOIL AMENDMENT ~ UNITS/ACRE I UNIT ~ S/UNIT ~ f/ACRE <br />Materiels used ft1: No fertilizer/enendnen[s required ~ ~ ~ ~ f0.00 <br />#2: <br />IF3: <br /> Total naterials cost/acre: 50.00 <br /> <br />AppLicetion method p1: <br />No fertilizer application required ------------ <br />50.00 <br />#2: <br /> Total application cost acre: 50.00 <br />F. MULCNI NG =___________ <br /> MULCH / NETTING / OTHER MATERIALS ~ UNITS/ACRE ~ UNIT ~ f/UNIT ~ f/ACRE <br />Materials used p1: straw (delivered) - ton * ~ 2.00 ~ ton ~ 575.28 ~ f150.56 <br />it2: ~ ~ ~ ~ <br />A3: <br />p4: <br /> Total materiels cost/acre: (150.56 <br /> <br />Application method A1: <br />crimping (with tractor) • ________-___ <br />(41.41 <br />#2: <br />1~3: <br /> Total application cost/e[re: f41.41 <br />G. JOB COST =_______-___ <br />Total area to be seeded: 88.00 acres. Total S/acre <br />___________ 5548.06 Total Initial Job Cost= <br />____ ____ 548,228.86 <br />____________ <br /> <br />Estimated failure rate: ___________ <br />50-OOX of area. Total S/acre' _________ <br />5331-58 Total Reseeding Costs = ____________ <br />514,589.31 <br /> ___________ g <br />• Reseedin cost items: A C D F _________ - <br />GRAND TOTAL !Og COST ____ <br />562,818.17 <br />