My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC20536
DRMS
>
Back File Migration
>
Inspection
>
INSPEC20536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:16 PM
Creation date
11/18/2007 9:35:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Inspection
Doc Date
8/18/2000
Doc Name
MINE SITE EVALUATION STATE PROGRAM
From
OSM
Inspection Date
8/2/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br /> <br />Mine Site Evaluation <br />~.t,3~t~,~o~ram <br />I. Petmi[[ee/Person 9. Perini[ Number 10. Permit Type <br /> SENECA COAL CO. C-005-80 PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> P. O. BOX 670, C/O MIKE A Division of Minerals 8 G 08/02/2000 O~ ~Y <br />3. City 4. Stale mm - dd - yyyy <br /> 14. Petmi[ Status I5. Site Status l6. Facility Type <br />HAYDEN CO <br />a MC <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81639- ( ~ 020 <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> ROUTT <br />8 <br />Mi <br />N 05-00304 CO <br /> . <br />ne <br />ame <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />SENECA #II <br />084730 <br />25. Hours 26. $~ nature Block . 27. Reviewing O ial: <br />1.0 a. Permit Review J <br /> <br />g <br />0 b. Site Visit Time i afore: ~ fS OD Signature: <br />, HENRY AUSTIN m # 116 <br /> ~ <br />Travel Time <br />0 c <br />10 Review Date: <br />/ ~/ (jv <br />. <br />. Printed Name: mm - dd - yyyy <br />1.5 d. Report Writing Date: 08/08111100 Is Supplemental MSE Page Used Y/N Y^ <br />Permlt Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Referral (non site visit) <br />pxx... Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF....Citizen Complaint Follow-up <br />Joint Inspedlon -Item 13 A )olnt inspection is when a state Inspector accompanies an OSM Inspector any time during the review of the mine site. <br />Permlt Status -Item 14 AB....Abandoned: All surface and underground coal miningg activities have ceased end <br />operator has left the site without oompte6ng redama6on as defined In <br />A.... Active: Coal mining end redamation activities occuning or 30 CFR 840.11(8 <br />ermitted but not <br />et dlsNrb <br />d <br />AB1 <br />~ <br />pp <br />y <br />e <br />. <br />..Bond Forfeiture: <br />ond todeiture officially in process or completed, and. <br />IN <br />Perm <br />I <br />ti <br />t P <br />P <br />it <br />Ph <br />II <br />l <br />t <br />d <br />d <br />nac <br />.... <br />ve ( <br />anen <br />rogram <br />erm <br />): <br />ase <br />comp <br />e <br />e <br />or reclamation in progress or not yet commence <br />. <br />Temporary Cessation of Operagons. (Interim Program Permd) AB2..Par6ally Reclaimed FodeiNre: Forfeited site where ell bonds have been <br />Coal mining completed arM redanration activities initiated. used to reclaim site, but site not redaimed to Program standards. <br />BR...BOnd Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Fodei[ed site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site Is unpennitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining end reclamation MC..Mining Complete: No mining activity on site, FP.. Fodeiture Pending The RA Is pursuing <br />d th <br />i <br />h <br />b <br />i <br />ll <br />d <br />i <br />t <br />k <br />operat <br />ave <br />ons <br />o revo <br />t, cu <br />e <br />e <br />ons <br />een starte <br />e the perm <br />. site regraded and awaiting phase bond release. ad <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted pedormance bond(s), and/or reclama- <br />ress <br />have started and where coal m <br />o <br />erations cessation of minin <br />ursuant to 30 CFR 816/ lion of fodeited site is in <br />ro <br />n <br />p <br />g p <br />. <br />i <br />ing <br />p <br />g <br />ha <br />t be <br />131(b) <br />reilure <br />e <br />Un <br />617 <br />FR <br />F <br />feit <br />d <br />d R <br />l <br />i <br />F <br />d <br />G <br />v <br />no <br />. <br />. <br />. <br />e <br />an <br />me <br />.. <br />or <br />ec <br />a <br />: <br />o <br />AP <br />A <br />ti <br />C <br />l P <br />d <br />i <br />i <br />i <br />P1 <br />Ph <br />I <br />l <br />A <br />I b <br />l <br />l <br />ti <br />l <br />C <br />l <br />P <br />d <br />.. <br />c <br />ve <br />oa <br />ro <br />uc <br />ng: <br />oal surtace m <br />n <br />ng <br />e <br />ease: <br />on <br />re <br />ama <br />on comp <br />... <br />ase <br />t <br />east <br />hase <br />ease rec <br />eted. <br />activities are occurring. granted for entire permitted area. For intedm FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facilit1yv such as ti le or preparation plant P2.. Phase II Release: At least Phase II bond release WC.Wildrat: Coal mining and reclamation <br />lace and <br />M <br />Th <br />P <br />k <br />i <br />it S <br />it <br />i <br />f <br />h <br />ti <br />i <br />ti <br />h <br />t <br />NM <br />N <br />t <br />i <br />ti <br />d <br />ave or are <br />ing p <br />o <br />n <br />ng: <br />e <br />erm <br />ve, s <br />e <br />s <br />or t <br />e en <br />re perm <br />area. opera <br />ons <br />a <br />.. <br />ta <br />us <br />s ac <br />tte <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the acawry is not covered by the <br />y <br />A. <br />minin ediw ,and site not re retied. the RA has released all bond. required permits from the <br />Faelllty Type Codes -Item 76 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site ppermitted <br />A... Surface E... Refuse and/or Impoundment I... Nonce of Intent to Explore under 30 CFR785.25 <br />8... Underground F... Loading Facility and/or Tipple J... Exempt 16 and Z3 <br />C... Preparation Plant G... Stockp9es K...Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page I of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (I-888-734-3247). ac+ud o~~n~r <, ruse <br />
The URL can be used to link to this page
Your browser does not support the video tag.