Laserfiche WebLink
<br />SS. Compliance with Colorado Sur'ace Coal ;fining Reclamation act <br />CRS 1°73, as amended 34-33-IO_, et. sec., <br />and tie -~ <br />Rules and Regulations Sssued Pursuant to t7e act <br />This includes a Iisti:g of the particular provisions of the regulatory program whici tiers <br />examined during t5e course of elv:s inspection, and ident fies enforcement actions taken <br />dur'_nq the inspection far ;allure to comply with t`te Rules and Regulations, the act aid <br />the permit. <br />4.03 Roads <br />The pile of road scrapings at the inlet to culvert 3 was removed. <br />4.05 Nydro.7ogic Ifalance <br />The materials blocking.the diversion ditch east of the shop have been cleaned. <br />The diversion ditch above the mine has not yet been cleaned. During this runoff <br />season, several rills have formed downslope. The operator has requested to construct a <br />berm along the outside of the road to prevent water from running downslope rather than <br />clearing the ditch, which would regaire blasting sortie sandstone. The operator should submit <br />a plan foz' the berm, including height and naintenance. <br />4.12 Slides <br />Several small rock falls have occurred near the portal face-up. Gne is blocking <br />the bench. It appears that runoff from above may be tt~e cause for the small slides. <br />Once the diversion ditch is repaired, the problem r+ith rock slides should be reduced. <br /> <br />