Laserfiche WebLink
~ III IIIIIIIIIIIII III <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St .Room ? I S <br />Denver, Colorado 80203 <br />Phone. I J03) 866-3567 <br />FAX: 1303)832-8106 <br />December 12, 2000 <br />Mr. Carl C. Herskind <br />Transit Mix Concrete <br />P.O. Box 1030 <br />Colorado Springs, CO. 80901-1030 <br />Permit # M-1973-007SG Daniels's Sand Pit #2 <br />Dear Mr. Herskind, <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />R E C L A M A T I O N <br />MI NING•SAFETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Ezecuove Director <br />Michael B. Long <br />Dinsion Dneaor <br />On October I0, 2000, [he Division conducted a monitoring inspection of the site and identified <br />the following possible problems. <br />1) No reclamation warranty for the process conveyer system measuring approximately 1500 feet. <br />2) There was a water treatment plant and numerous wells located with in the permit area that <br />were not related to the mining operation. <br />The Division requested the operator to post the appropriate financial warranty for the removal of <br />the conveyer system by 1-18-2001, which the operator allocated the appropriate warranty$ 6,200 <br />from the existing warranty of $ 1, 038,500 on 11-28-00 for the removal and disposal of the <br />conveyer system. <br />I[ also requested the operator to provide a Technical Revision (TR) to establish ownership of the <br />water treatment facility and provide proof that these man made structures will not be affected by <br />the mining operation in accordance with Rule 6.4.19. On November 28, 2000, the Division <br />received a letter with attachments explaining why the operator does not need to submit the <br />requested TR. After having your response reviewed by the State Attorney General's Office, it is <br />the opinion of the AG's Office and the Division that Transit Mix must submit a TR to modify <br />Permit # M-1973-007 (Daniel's Sand Pit # 2) by 1 -18-2001. The TR, at a minimum, must <br />include the following information. <br />1) A map showing the location of [he water treatment facility and monitoring wells. <br />2) It must explain ,how these structures will affect or change the mining or reclamation <br />