My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC19884
DRMS
>
Back File Migration
>
Inspection
>
INSPEC19884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:51 PM
Creation date
11/18/2007 9:32:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
Inspection
Doc Date
10/20/2006
Doc Name
Inspection report
From
DRMS
To
DGMC
Inspection Date
10/5/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID # M-1986-076 <br />INSPECTION DATE 10/5/06 <br />INSPECTOR'S INITIALS RCO,I(AP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />Topsoil is being allowed to degrade during the mining process, by failure to salvage it 12/31/06 <br />and its subsequent erosion and loss due to mixing with non-soil materials. PB or PV: PB <br />TOPIC(S~: TS <br />CORRECTIVE ACTION: The operator must submit a written plan in which he explains _, _, <br />how his soil salvage methods will be modified to ensure that topsoil is saved adequately <br />for reclamation. The written statenment must be received by this office by the date <br />shown at right. <br />2. None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPIC(S): <br />3. None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPIC(S): <br />4. None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPIC(S): <br />5. None. <br />PB or PV: <br />CORRECTIVE ACTION: NA TOPIC(S): <br />CERTIFICATE OF SERVICE <br />I, Bob Oswald, certify that I mailed a true and complete copy of the foregoing document (inspection report) to the operator at his <br />address of record, by depositing it postage paid with the US Postal Service, on the signature date shown below. <br />~`~ (~~ (signature) ~ 0 2 b B ~ (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.