My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC19861
DRMS
>
Back File Migration
>
Inspection
>
INSPEC19861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:50 PM
Creation date
11/18/2007 9:32:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002094
IBM Index Class Name
Inspection
Doc Date
6/19/2007
Doc Name
Inspection Report
From
DRMS
To
Maverick Sand & Gravel
Inspection Date
5/31/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Date : 15-Jun-2007 <br />User : WHE <br />Permit orjob no. <br />Abbreviation <br />Filename <br />Agency or organization name :DRMS <br />Permit orjob action : SO-Ol <br />ASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br /> <br />001 -Demolish and remove mining related structures demolish 1 8.0 $1,098 <br /> <br />002 -Highwall reduction from 0.5H:1V to 2.SH:1V dozer 1 26.7 $4,423 <br /> <br />003 -Rough grade 6 acres pit floor ensure 2' OVB replacement dozer 1 47.12 $7,925 <br /> <br />004 -Replace topsoil 0.5'thick over 10 acres affected lands scraper2 1 13.0 $4,927 <br /> <br />005 -Revegetate 10 acres affected land revege 1 10.0 $14,890 <br /> <br />006 -Haul reclamation equipment to and from job site mobilize 5 3.4 $1,928 <br /> <br />007 -Remove misc debris, assume 10'L x 10'W x 5'H @ $0.22/cf NA 1 4.0 $110 <br />inclutles inflation factor atljustment of : NA <br />INDIRECT COSTS <br />SUBTOTALS: 112.2 <br />TOTAL DIRECT COST' <br />OVERHEAD AND PROFIT - Llablllty InSUfanCa : 2.02 % Of direct total = $713 <br />Performance bond : 1.05 % of direct total = $371 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $3,530 <br />'not required (or eqp. operator serves as super) TOTAL 0 8 P = $4, 614 <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT • CONTRACT AMOUNT (direct+ O 8 P) _ $39,915 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />. Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,996 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted /or of task level TOTAL INDIREC7 COST = $7,110 <br />M-2002-094 <br />none <br />M094-000 <br />Site :Allen Pit <br />State :Colorado <br />County :Montrose <br />TOTAL BOND AMOUNT (direct+ indirect) _ $42,411 <br />
The URL can be used to link to this page
Your browser does not support the video tag.