Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User: <br />Agency or organization name :DRMS <br />004 State :Colorado <br />06/15/2007 County :Montrose <br />WHE Site :Allen Pit <br />Permit/job # :M-2002-094 <br />Abbreviation :none <br />Filename : M094-004 <br />Permit or otherjob action :So-Ol <br />Task description :Replace topsoi10.5' thick over 10 acres affected lands <br />HOURLY EQUIPMENT COST <br />Description <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :L t 633E Series 2 (2001) - <br />-Push dozer :NA <br />Support equipment -Load area :Cat D8R Series 1! - SSU (2005) <br />-Dump area <br />Road maintenance -Motor grader :NA <br />-W ater truck :~NA <br />akdown : Scraper Work Team <br />Scraper I Dozer Support Equipment <br />Load area I Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />Utilization-machine : 100 NA 100 NA NA NA <br />-Ripper attachment : NA NA 10 NA NA NA <br />Ownerhip cosUhour : $81.70 NA $51.18 NA NA NA <br />OperatingcosUhour: $114.18 NA $73.75 NA NA NA <br />Ripper op.cosUhour: NA NA $0.00 NA NA NA <br />Operator cosUhour : $24.95 NA $32.78 NA NA NA <br />Unit subtotals : $220.83 NA $157.70 NA NA NA <br />Number of units : 1 0 1 0 0 0 <br />Group subtotals: Work: $220.83 Support: $15770 Maintenance: $0.00 <br />Total work team cosUhour : $378.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,067 LCY factor : NA volume : 8,067 LCY <br />sheet 1 of 2 <br />Source of quantity take-off : (70ac)(43560sf/ac)(0.5'D)/27 = 8066.67 cy <br />Source of estimated swell factor: NA <br />