My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC19839
DRMS
>
Back File Migration
>
Inspection
>
INSPEC19839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:49 PM
Creation date
11/18/2007 9:32:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
2/22/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Cazbon Junction Mine conducted by Tom Kaldenbach of CDMG. <br />No one represented the operator during the field portion ofthe inspection. Matt Gavin of GoffEngineering <br />and Surveying was present during the records check at the Goff Engineering office. The mine site was <br />cleaz of snow. There was no activity on the site, including the Ewing pit sand and gravel operation that <br />was reclaimed in summer 2005. Straw mulch has been placed on the reclaimed multi-use area of the sand <br />and gravel operation. Public access to the site is prevented by a locked gate. The coal mine site appeazed <br />as it did on the last complete inspection conducted in December 2005. <br />Availability of Records <br />All required records were available (see attached list). <br />Signs and Markers <br />The mine i.d. sign is properly displayed at the entrance. <br />Roads <br />The North pit haul road is surfaced with cobbles. The road is rough, but passable. Gravel berms (water <br />bars) that extend across this road discourage public access. <br />Hydrologic Balance <br />Pond 1 (large pond) -The pond was dry, as usual. The flume, embankment, and inslopes were in good <br />shape. <br />Pond 2 (small pond) -This pond was dry, as usual. The flume, embankment, and inslopes were in good <br />shape. <br />Backfill and Grading <br />No backfilling has been done in the North pit since 2003. <br />To soil <br />Topsoil stockpiles 2, 4, 7, and 8 remain for reclamation of the coal mine site. Stockpile 2 will be <br />hauled to the North Pit where it will be used as fill and for revegetation. (Part of the permanently <br />reclaimed spoil area will also be used as fill in the North Pit.) All four topsoil stockpiles are <br />adequately protected by vegetation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.