Laserfiche WebLink
:~- <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Coal Gulch Mine for the month of November, 2000. The site has <br />traces of snow on the north slopes. <br />Hydrolopic Balance: The pond had approximately 2' of water in it but was not discharging. The primary <br />spillway is covered with fill material and is no longer functional. The upper trap is dry. <br />Reclamation Success: The site vegetation is dormant at this time. <br />General Mine Comaliance: Firehawk Construction Company has significantly reduced the amount of <br />topsoil stored on site but still has material and junk stored off their property. <br />