My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC19821
DRMS
>
Back File Migration
>
Inspection
>
INSPEC19821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:20:48 PM
Creation date
11/18/2007 9:32:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977196
IBM Index Class Name
Inspection
Doc Date
3/11/1999
Doc Name
BUENA VISTA PIT PN M-77-196 STATUS OF COMPLIANCE PROBLEMS IDENTIFIED IN THE REPORT OF THE DIV 03-03-
From
DMG
To
BARNHART AGENCY INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • iii iiiiiiiiiiiu ~u <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Shcmlan $L, Room ? 15 <br />Dcnaer, Colorado 80203 D I v 15 1 0 N O F <br />Phone: 1303) 866-7567 MINERAL S <br />FAR; (3071 B32-BIUh ~ <br />GEOLOGY <br />RECLAMATION <br />tvtarch I I, 1999 MINING•SAFETY <br />Mr. Lloyd V. Bamhan s,llowen: <br />Barnhart Agency, Inc. wve~nor <br />212 West 13'" St. ores E. walcner <br />Pueblo, CO H I (103 Executive Director <br />Michael B. Long <br />Division Director <br />RE: Buena Vista Pit (Permit h1-77-1961 Stam, of compliance problems identified in the report of [hc <br />Division's 2/3/99 inspection of the pit. <br />Deaz Mr. Baznhart: <br />As a result of your letter dated March 9, 1999, the Division has altered the status of certain of the above <br />referenced compliance problems as follows: <br />Compliance Problem t (Information required as result of inactivity): This problem has been <br />vacated as a result of your report of activity in 1997 and 1998. <br />Compliance Problem 2 (Adequate marking of permit area boundaries): This problem has not been <br />resolved since you did no[ report the required marking as being completed. <br />Compliance Problem 3 (Topsoil stabilization): This problem has been vacated based on your <br />assurance that the topsoil will be utilized this year. <br />Compliance Problem 4 (Topsoil adequacy): This problem is unresolved at this time since the <br />permit amendment altering the post minin; land use and reclamation needs has rotbeer. submitted. <br />Compliance Problem 5 (Mining disturbance outside permit area): This problem has been abated <br />based on your commitment to reclaim the area. <br />Compliance Problem 6 (Possible damage to utility line): This problem is unresolved at this time <br />since neither a compensation agreement with the owner has been provided nor an engineering evaluation <br />supplied that demonstrates the line will not be damaged by the mining operation. <br />Compliance Problem 7 (InsufTicient financial warranty): This problem is unresolved at this time <br />since an agreement has not been reached on the amount of warranty required and that amount posted with = <br />the Division. <br />If you have any questions on the above, please contact me. <br />Sincerely, <br />James C. Stevens <br />Sr. Specialist <br />99N021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.