Laserfiche WebLink
<br /> <br />(Page 2) <br />MINE ID # OR PROSPECTING ID #: M-80-244 <br />INSPECTION DATE: S-S-00 INSPECTOR'S INITIALS: ~I~ <br />OBSERVATIONS <br />The Division conducted a monitorine inspection of the Phase II and Phase III construction areas. Present durin¢ the <br />inspection were Mr Terry Mandziac and Mr. Scott Lewis of CC&V. The inspection began around the Phase III area. East <br />facing slopes were beine evaded in anticipation of clay liner deployment. Leak detection trenches #5 and 8 were being <br />extended at the time of the inspection Golder QA/QC personnel were present at the time overseeine the operation Clay <br />liner was being deployed and compacted on the portions of the East facing slopes facing slopes. <br />Lds # 3 sump has been extended b~aporoximately 20 feet to allow the 10 feet wide road that runs parallel to the phase ii <br />leach pad Inspected the phase II area The following readings were taken from the High volume and Low volume solution <br />collection transducers. <br />High volume pump # 4 read 13.7 feet of head. <br /># 5 read 16.8 feet of Head MAX. ALLOWABLE FEET OF HEAD IS 47 FEET <br />#6 read 18.7 feet of head <br />Low Volume pump #1 read .42 feet of head <br />#2 read .17 feet of head MAX. ALLOWABLE FEET OF HEAD IS 2 FEET <br />Inspected the crusher area. no major problem noted. The crusher was active. al the time of the inspection. Inspected the <br />East Cresson pit area, it was active. no problem noted. <br />I & E Contat Address <br />NAME: SCOTT LEWIS <br />OPERATOR: CCRV <br />STREET: P.O BOX 191 <br />CITY/STATE2IP: VICTOR, CO 80860 <br />James Stevens <br />cr. ^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />^ OTHER <br />