Laserfiche WebLink
<br />MEIR NARRATIVE <br />The haul road certification for as builts is dated 4\18\88. <br />4 <br />A letter was on file for the Succession of Operators identifying the change <br />on July 2, 1992. A submittal was made to the Division on May 27, 1992. The <br />name of the mine was changed June 2, 1992. <br />The 270 day notice for permit renewal will be sent to the operator on <br />August 26, 1992. <br />There is no blasting at this time, they do not have a current public <br />blasting notice. <br />Signs are posted at all points of public access to the mine with the <br />current mine name and mailing address. Perimeter markers and topsoil signs <br />are in place. <br />The annual hydrology report was sent to the Division on 2\2\92. <br />The annual reclamation report was posted 6\15\92. Acres backfilled and <br />graded for the year were 66.8, topsoiled acreage was 59.9. <br />